Permit Details

Permit Search

Permit

Mobile Home

3690 SW ICHETUCKNEE AVE
LAKE CITY, FL 32024

Permit #
000048854
Application #
63491
Status Completed
  1. Submitted Dec 1, 2023
  2. Issued Dec 13, 2023
  3. Expires Jul 22, 2024
  4. Completed Jan 24, 2024

Property

Parcel #
00479-102
Owner
Bias Richard Ellet,
Acres
5.04
Subdivision
Flatt
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0370C
Mobile Home is a:
Single Wide
Year Built
2024
Width (Ft.In)
16
Length (Ft.In)
66
Driveway access to home:
Existing Drive
Installation Decal #
106116
Septic #
23-0808
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA20039443
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Zoning Review - Reviewed
  6. Plan Review - Building Approved
  7. Plan Review - Reviewed
  8. Final Review - Processing
  9. Final Review - Documents Required
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Jan 24, 2024

    Passed: Mobile Home - Mobile Home Set-Up Final

    Septic Needed

    Inspected by Matt Forsyth

  2. Jan 24, 2024

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jan 31, 2024

    Release to power company

    Inspected by Melissa Garber

  4. Jan 31, 2024

    Septic Release Inspection

    Inspected by Health Dept