| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Compaction On Sides Of Fill Dirt |
Anthony Aslan |
12/29/2023 |
| Passed: Electrical - Temporary Service |
|
Anthony Aslan |
12/29/2023 |
| Release to power company |
|
Anthony Aslan |
12/29/2023 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
1/3/2024 |
| Cancelled: Building - Footer |
|
Anthony Aslan |
1/3/2024 |
| Cancelled: Building - Slab |
|
Anthony Aslan |
1/3/2024 |
| Passed: Building - Monolithic Slab |
Need Fiber Ticket For Concrete |
Anthony Aslan |
1/3/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
1/3/2024 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
1/17/2024 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
1/17/2024 |
| Passed: Building - Framing |
Previous Looked At Wrong Permit. |
Anthony Aslan |
2/5/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/7/2024 |
| Failed: Mechanical - Rough In |
Exhaust Vent Not Allowed To Come Out Over Windows
main Return In Hallway No Canstock On Duct
ducts Missing Strapping
boots Not Sealed To Flex |
Anthony Aslan |
2/7/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
No Water In Tub Check At Next Inspection |
Anthony Aslan |
2/7/2024 |
| Passed: Building - Framing |
|
Anthony Aslan |
2/7/2024 |
| Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
2/8/2024 |
| Passed: Building - Insulation |
Spray Foam Attic, Batt Walls |
Anthony Aslan |
2/16/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
3/21/2024 |
| Release to power company |
|
Melissa Garber |
4/2/2024 |
| Septic Release Inspection |
|
Health Dept |
4/2/2024 |
| Passed: Building - Final |
|
Anthony Aslan |
5/28/2024 |