Mobile Home
Permit
| Application #: | 63100 |
| Permit #: |
000048779 |
| Related Permit: |
|
| Submitted: | Monday, October 23, 2023 |
| Issued: | Monday, December 4, 2023 |
| Expires: | Tuesday, June 11, 2024 |
| Completed: | Tuesday, June 11, 2024 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
MFE= 1" ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0260C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2024 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
44 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
103207 |
| Septic # |
23-0742 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 10/23/2023 |
Application pending. |
| 10/23/2023 |
Application submitted by applicant. |
| 10/23/2023 |
Point Review - Printed-Online Application |
| 10/23/2023 |
Point Review - Reviewed |
| 10/27/2023 |
Plan Review - Reviewed |
| 11/6/2023 |
Zoning Review - Reviewed |
| 12/4/2023 |
Final Review - Reviewed |
| 12/4/2023 |
Final Review - Payment Needed |
| 12/4/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Rusty L Knowles Floridas Finest Mobile Home Set Up
|
IH1038219 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Copper Bond Not Connected Septic Is Needed Also |
Matt Forsyth |
5/22/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/22/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic |
Matt Forsyth |
5/22/2024 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/22/2024 |
| Release to power company |
Rec'd Septic |
Matt Forsyth |
6/11/2024 |
| Certificate-Release Certificate |
Rec'd Septic |
Matt Forsyth |
6/11/2024 |
| Septic Release Inspection |
|
Health Dept |
6/11/2024 |