Permit Details

Permit Search

Permit

Storage Building

260 NW WHITTON CT
LAKE CITY, FL 32055

Permit #
000048757
Application #
63230
Status Completed
  1. Submitted Nov 1, 2023
  2. Issued Nov 30, 2023
  3. Expires Oct 12, 2024
  4. Completed Apr 15, 2024

Property

Parcel #
02202-119
Owner
Gillespie William Wesley Jr, Chandler Katherine
Acres
11.57
Subdivision
High Pointe
Zoning
PRRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Fema map number
12023C0280D
In floodway
N
Type of Structure
Garage
Commercial or Residential?
Residential
Total Area (Sqft)
700
Septic# (00-0000) or (X00-000)
23-0733
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
200'
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
NON-HABITABLE structure
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height
17'
Building Length
28'
Building Width
28'
Service Amps
20

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Plan Review - Documents Required
  7. Plan Review - Reviewed
  8. Zoning Review - Reviewed
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Nov 7, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Dec 21, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Dec 21, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Jan 18, 2024

    Passed: Building - Slab

    The Perimeter Bar Always Needs To Be Tied Up Three Quarter Clearance Plastic Cut Back Away From Block

    Inspected by Matt Forsyth

  5. Feb 16, 2024

    Passed: Building - Framing

    Inspected by Troy Crews

  6. Feb 16, 2024

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  7. Feb 16, 2024

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  8. Apr 15, 2024

    Passed: Engineering - Access Road/Driveway Right-of-Way Integrity Inspection

    Inspected by Matt Forsyth

  9. Apr 15, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth