Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Solar Power System Permit
Address 340 SW CALLAWAY DR
LAKE CITY, FL 32024
Parcel #: 03023-250
Acres: 0.51
Owner: Kunzler William J, Kunzler Anna L
Subdivision: Callaway Phase 2
Zoning: RSF-2
Flood Zone: A
District: 3
Application #: 63342
Permit #: 000048696
Related Permit:
Submitted: Friday, November 10, 2023
Issued: Monday, November 20, 2023
Expires: Tuesday, March 26, 2024
Completed: Tuesday, March 26, 2024
Status: Completed
Septic Release? na
Notes:

LAKE CITY UTLITY CUSTOMER SERVICE NOTES If digging is required; locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
PV Type Utility Interactive PV System- (DC to AC with utility connection)
Grounding N.E.C. Chapter 690
AC Options Exposed
AC Options (Cont..) In Conduit
Where are the panels mounted? Roof Mounted
Power Company Clay Electric
Service Amps 200
Residential or Commercial? Residential
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0289D
Review Notes
11/10/2023 Application pending.
11/10/2023 Application submitted by applicant.
11/10/2023 City of Lake City Utilities Notified City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
11/13/2023 Point Review - Reviewed NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS - CITY STATE AND ZIP * ENGINEER CELL TO BE FILLED IN
11/16/2023 Plan Review - Reviewed NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS - CITY STATE AND ZIP * ENGINEER CELL TO BE FILLED IN
11/17/2023 Final Review - Corrections Needed NEEDED * ENGINEER BLOCK FILLED IN WITH ENGINEER NAME, ADDRESS, AND PHONE NUMBER
11/17/2023 Final Review - Reviewed
11/17/2023 Final Review - Payment Needed
11/20/2023 Permit Issued Permit # created and approved from payment.
3/4/2024 Final Review - Payment Needed
3/12/2024 Plan Review - Reviewed
Contractors
Name/ Business License Title Role
Mark Wasmiller
Sunergy Solar Llc
EC13011940 Cert. Electrical Contractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Permanent Power Matt Forsyth 3/26/2024
Release to power company Matt Forsyth 3/26/2024
Passed: Solar - Solar Final Matt Forsyth 3/26/2024