Permit Details

Permit Search

Permit

New Residential Construction

163 SW SEDGEFIELD FARMS GLN
FORT WHITE, FL 32038

Permit #
000048691
Application #
63010
Status Completed
  1. Submitted Oct 16, 2023
  2. Issued Nov 17, 2023
  3. Expires Mar 16, 2025
  4. Completed Sep 19, 2024

Property

Parcel #
03767-318
Owner
Meredith William J Jr, Meredith Lesa A
Acres
6.87
Subdivision
Sedgefield Phase 3
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
86'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0480C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2384
Total Area (Sqft)
3831
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0761
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Contact the Building Dept
  4. Final Review - Status Cleared
  5. Point Review - Printed-Online Application
  6. Point Review - Reviewed
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Dec 1, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Dec 1, 2023

    Passed: Building - Footer

    2 #5

    Inspected by Gary Pitzer

  3. Jan 3, 2024

    Electrical -1st Underground Rough–In

    Under Slab Conduit

    Inspected by Gary Pitzer

  4. Jan 3, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  5. Jan 8, 2024

    Passed: Building - Slab

    Wire, Steel, Plastic Taped

    Inspected by Gary Pitzer

  6. Feb 26, 2024

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  7. Feb 26, 2024

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  8. Apr 5, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  9. Apr 5, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. Apr 5, 2024

    Passed: Building - Framing

    No Mechanical System At This Time

    Inspected by Gary Pitzer

  11. Apr 12, 2024

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. May 6, 2024

    Passed: Building - Insulation

    Foam Roof, Batts In Walls

    Inspected by Gary Pitzer

  13. Aug 9, 2024

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  14. Aug 9, 2024

    Release to power company

    Inspected by Gary Pitzer

  15. Sep 12, 2024

    Failed: Building - Final

    Electrical Outlets In #1.floor, #2. Under Island And #3.hanging Out Of Wall Not Complete. #4, Need To Move Ac Unit Out From In Front Of Disconnect So As To Give Access.

    Inspected by Gary Pitzer

  16. Sep 17, 2024

    Passed: Building - Final

    Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents.

    Inspected by Gary Pitzer

  17. Sep 18, 2024

    Certificate-Release Certificate

    Rec'd Missing Docs/septic Release

    Inspected by Gary Pitzer

Documents