| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Compaction At Slab Inspection |
Anthony Aslan |
3/14/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
4/11/2024 |
| Passed: Building - Monolithic Slab |
|
Anthony Aslan |
4/11/2024 |
| Failed: Building - Wall Sheathing |
No Porta Potty
nails, Side Wall Strapping Missing
valley Blocking At Over Hang Missing Both Sides Of Gable |
Anthony Aslan |
6/27/2024 |
| Cancelled: Re-Roof - In Progress |
|
Anthony Aslan |
6/27/2024 |
| Passed: Building - Roof Decking |
Roof Only
walls Need Corrections |
Anthony Aslan |
6/27/2024 |
| Failed: Mechanical - Rough In |
Mixing Box Sitting On Boot Rails, Minimum 2"
exhaust Fan Venting Not Allowed Over Windows |
Anthony Aslan |
12/30/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
12/30/2024 |
| Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Supply Lines
no Water In Tube |
Anthony Aslan |
12/30/2024 |
| Failed: Building - Framing |
Exterior Straps Not Blocked On Inside, Nails Missing On Strap, Items Marked In Red Marker, Also Miss Nail Guards |
Anthony Aslan |
12/30/2024 |
| Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
5/5/2025 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/5/2025 |
| Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
5/5/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
5/5/2025 |
| Passed: Building - Insulation |
Walls 13 And Ceiling 38 Batt |
Anthony Aslan |
6/24/2025 |
| Cancelled: Building - Wall Sheathing |
|
Anthony Aslan |
7/8/2025 |
| Passed: Electrical - Permanent Power |
|
Christian Allen |
1/2/2026 |