Swimming Pool and Spa
Permit
| Application #: | 62923 |
| Permit #: |
000048637 |
| Related Permit: |
|
| Submitted: | Friday, October 6, 2023 |
| Issued: | Monday, November 13, 2023 |
| Expires: | Monday, April 22, 2024 |
| Completed: | Monday, April 22, 2024 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0490C |
| Is this for residential or commercial use? |
Residential |
| This is the construction of a: |
Pool |
| Setbacks Front |
25' |
| Setback Side 1 |
15' |
| Setbacks Rear |
10' |
| Setback Side 2 |
15' |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
23-0736 |
| Service Amps |
200 |
Review Notes
| 10/6/2023 |
Application pending. |
| 10/6/2023 |
Application submitted by applicant. |
| 10/13/2023 |
Point Review - On Hold-Incomplete |
| 10/17/2023 |
Point Review - Reviewed |
| 10/19/2023 |
Plan Review - Reviewed |
| 10/25/2023 |
Final Review - Documents Required |
| 11/13/2023 |
Final Review - Reviewed |
| 11/13/2023 |
Final Review - Payment Needed |
| 11/13/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Rogelio Veloz A-1 Veloz Contractor, Inc
County License & State License & Liability Insurance & Workers Comp Expired. |
CPC1460246 |
Cert. Residential Pool |
Contractor |
Donald Davis High Springs Electric Inc
|
EC0002306 |
Electrical Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
10/31/2023 |
| Electrical -1st Underground Rough–In |
Steel Bond In Place |
Gary Pitzer |
12/6/2023 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
Need Owner To Sign Barrier Affidavit |
Anthony Aslan |
12/7/2023 |
| Passed: Electrical - Pool/Deck Bonding |
|
Anthony Aslan |
12/7/2023 |
| Passed: Swimming Pool - Pool Footer |
|
Anthony Aslan |
12/14/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/14/2023 |
| Failed: Swimming Pool - Pool Steel and Ground |
Bonding Only Bonded In One Spot |
Anthony Aslan |
12/14/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/14/2023 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Anthony Aslan |
12/15/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/15/2023 |
| Passed: Swimming Pool - Pool Safety and Final |
|
Anthony Aslan |
4/22/2024 |