Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
11/6/2023 |
Electrical -1st Underground Rough–In |
Steel Bond |
Gary Pitzer |
3/21/2024 |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
3/21/2024 |
Passed: Building - Footer |
2 #5 |
Gary Pitzer |
3/21/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/28/2024 |
Passed: Building - Slab |
Wire And Still Over Taped Plastic |
Gary Pitzer |
4/2/2024 |
Passed: Building - Wall Sheathing |
|
Gary Pitzer |
4/25/2024 |
Passed: Building - Roof Decking |
|
Gary Pitzer |
4/25/2024 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
4/25/2024 |
Passed: Building - Framing |
|
Gary Pitzer |
4/25/2024 |
Passed: Building - Roof Decking |
|
Gary Pitzer |
4/25/2024 |
Cancelled: Electrical - 2nd Rough-In |
|
Gary Pitzer |
4/25/2024 |
Cancelled: Mechanical - Rough In |
|
Gary Pitzer |
4/25/2024 |
Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
4/25/2024 |
Passed: Building - Framing |
|
Gary Pitzer |
5/16/2024 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/16/2024 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
5/16/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
5/16/2024 |
Passed: Building - Insulation |
R13 Batts In Walls Only |
Gary Pitzer |
5/21/2024 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
6/26/2024 |
Passed: Electrical - Permanent Power |
|
Gary Pitzer |
7/16/2024 |
Release to power company |
|
Gary Pitzer |
7/16/2024 |
Passed: Building - Final |
Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Gary Pitzer |
9/10/2024 |
Certificate-Release Certificate |
|
Gary Pitzer |
9/11/2024 |