8/3/2023
|
Application pending.
|
8/3/2023
|
Application submitted by applicant.
|
8/9/2023
|
Point Review - Reviewed
NEEDED
* SERIAL #
* DECAL #
* SITE PLAN WITH DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPROVAL
|
8/9/2023
|
Point Review - Printed-Online Application
NEEDED
* SERIAL #
* DECAL #
* SITE PLAN WITH DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPROVAL
|
8/10/2023
|
Plan Review - Reviewed
NEEDED
* SERIAL #
* DECAL #
* SITE PLAN WITH DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPROVAL
|
8/18/2023
|
Zoning Review - Documents Required
NEEDED
* SERIAL #
* DECAL #
* SITE PLAN WITH DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPROVAL
|
9/12/2023
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPLICATION/APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
9/15/2023
|
Zoning Review - Documents Required
NEEDED
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
* 911 ADDRESS VERIFICATION
* STUP APPLICATION/APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
9/18/2023
|
Zoning Review - Documents Required
NEEDED
* 911 ADDRESS
* STUP APPLICATION/APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
10/17/2023
|
Zoning Review - Documents Required
NEEDED
* 911 ADDRESS
* STUP APPLICATION/APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
10/24/2023
|
Zoning Review - Documents Required
NEEDED
* 911 ADDRESS
* STUP APPLICATION/APPROVAL
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
10/26/2023
|
Zoning Review - Reviewed
NEEDED
* 911 ADDRESS
**THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
10/31/2023
|
Final Review - Reviewed
|
10/31/2023
|
Final Review - Payment Needed
|
11/1/2023
|
Permit Issued
Permit # created and approved from payment.
|