Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Matt Forsyth |
11/6/2023 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/6/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
12/1/2023 |
Passed: Building - Slab |
Perimeter Bar Should Always Be Tied Up For Concrete Consolidation |
Matt Forsyth |
12/7/2023 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
12/12/2023 |
Release to power company |
|
Matt Forsyth |
12/12/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
1/16/2024 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
1/16/2024 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
2/8/2024 |
Passed: Building - Framing |
Header On Back Porch For French Doors Was Overlooked Nailing |
Matt Forsyth |
2/13/2024 |
Passed: Electrical - 2nd Rough-In |
Watch For Romex Not In Boxes |
Matt Forsyth |
2/13/2024 |
Passed: Mechanical - Rough In |
Attic Unit |
Matt Forsyth |
2/13/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
2/13/2024 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
Need Water Holding In Shower Floor |
Matt Forsyth |
2/13/2024 |
Passed: Building - Insulation |
Spray Foam All Items Have Been Addressed |
Matt Forsyth |
2/22/2024 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Matt Forsyth |
6/24/2024 |
Release to power company |
|
Melissa Garber |
6/27/2024 |
Septic Release Inspection |
|
Health Dept |
6/27/2024 |
Cancelled: Building - Strapping |
|
Emaleigh Williams |
7/16/2024 |
Passed: Building - Final |
Mechanical Air Verified |
Matt Forsyth |
7/17/2024 |
Certificate-Release Certificate |
|
Melissa Garber |
7/23/2024 |