| Passed: Electrical - Temporary Service |
|
Gary Pitzer |
11/21/2023 |
| Release to power company |
|
Gary Pitzer |
11/21/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
12/6/2023 |
| Passed: Building - Footer |
2#5 Rebar Wired, Bond Wire In Place |
Gary Pitzer |
12/6/2023 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dvw With Water And Water Lines Under Preasure |
Gary Pitzer |
1/3/2024 |
| Passed: Building - Slab |
Wire Steel And Plastic Taped |
Gary Pitzer |
1/18/2024 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
2/6/2024 |
| Passed: Building - Framing |
|
Gary Pitzer |
2/6/2024 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
2/6/2024 |
| Passed: Building - Strapping |
|
Gary Pitzer |
2/6/2024 |
| Passed: Building - Wall Sheathing |
|
Gary Pitzer |
2/6/2024 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
2/27/2024 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
2/27/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
2/27/2024 |
| Passed: Building - Framing |
|
Gary Pitzer |
2/27/2024 |
| Passed: Building - Insulation |
|
Gary Pitzer |
3/12/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
5/10/2024 |
| Release to power company |
Rec'd Septic |
Anthony Aslan |
5/21/2024 |
| Septic Release Inspection |
|
Health Dept |
5/21/2024 |
| Failed: Building - Final |
Unable To Access Area Panel And Other Mechanical Equipment Doors Locked |
Gary Pitzer |
6/6/2024 |
| Passed: Building - Final |
|
Gary Pitzer |
6/7/2024 |