Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 226 SW CHERRY BLOSSOM WAY
LAKE CITY, FL 32024
Parcel #: 03011-125
Acres: 0.28
Owner: Gator Land Development, Llc,
Subdivision: Rose Pointe
Zoning: PRD
Flood Zone: X
District: 3
Application #: 62055
Permit #: 000048490
Related Permit: Culvert Waiver: 000048491
Submitted: Friday, July 28, 2023
Issued: Tuesday, October 24, 2023
Expires: Tuesday, September 17, 2024
Completed: Tuesday, September 17, 2024
Status: Completed
Septic Release? Yes
Notes:
MFE=104' PER PLAT SURVEYOR TO MARK SETBACKS IN FIELD
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The Utility Department approved a tap application for potable water.
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 104.0'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1596
Total Area (Sqft) 2225
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title SINGLE FAMILY DWELLING
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 23-0573
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
7/28/2023 City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
7/28/2023 Point Review - Reviewed
8/7/2023 Plan Review - Corrections Needed
8/7/2023 Plan Review - Building Approved
8/7/2023 Plan Review - Electrical Approved
8/7/2023 Plan Review - Mechanical Approved
8/7/2023 Plan Review - Plumbing Approved
8/7/2023 Plan Review - Fuel/Gas Approved
8/7/2023 Plan Review - Reviewed
8/16/2023 Zoning Review - Contact the Building Dept
10/5/2023 Zoning Review - Contact the Building Dept
10/5/2023 Zoning Review - Corrections Needed
10/16/2023 Zoning Review - Reviewed
10/23/2023 Final Review - Processing
10/23/2023 Final Review - Reviewed
10/23/2023 Final Review - Payment Needed
10/24/2023 Permit Issued
Contractors
Name/ Business License Title Role
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Robert Jarvis
Jarvis Heat And Air Llc
CAC1816766 Class "b" A/c Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Joseph C Peurrung
Benchmark Builders Llc
CBC1259347 Cert. Building Contractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 11/13/2023
Passed: Engineering - Setbacks Matt Forsyth 11/13/2023
Passed: Electrical - Temporary Service Matt Forsyth 11/13/2023
Release to power company Matt Forsyth 11/13/2023
Passed: Electrical - 1st Underground Rough–In Matt Forsyth 11/29/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 11/29/2023
Passed: Building - Slab Hold Up Perimeter Bar Minimum Three Quarter Inch Off Cement Block Matt Forsyth 12/6/2023
Cancelled: Mechanical - Rough In Melissa Garber 12/19/2023
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 1/29/2024
Passed: Building - Roof Decking Matt Forsyth 1/29/2024
Failed: Building - Framing Check Soul Plate Anchor Bolts Each Side Engineering Needs To Be Two By Material Instead Of 1 By Need Diagonal Bracing On Gable End Matt Forsyth 2/20/2024
Passed: Building - Framing Items Have Been Addressed Matt Forsyth 2/28/2024
Passed: Electrical - 2nd Rough-In We Need A Shield Plate At Top Of Wall Service Entrance Will Check On Insulation Inspection Matt Forsyth 3/21/2024
Passed: Mechanical - Rough In We Need A Shield Plate Top Of Wall Dryer Duct Will Check On Inspection For Insulation Matt Forsyth 3/21/2024
Passed: Plumbing/Gas - 2nd Rough-In Tub Water Tested Matt Forsyth 3/21/2024
Passed: Building - Insulation Matt Forsyth 3/27/2024
Passed: Electrical - Permanent Power Need Septic Release And Picture Of Dead Cover On Electrical Panel Matt Forsyth 7/17/2024
Passed: Electrical - Permanent Power Need Septic Matt Forsyth 8/15/2024
Release to power company Rec'd Septic Emaleigh Williams 8/22/2024
Septic Release Inspection Health Dept 8/22/2024
Certificate-Release Certificate Matt Forsyth 9/17/2024
Passed: Building - Final Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Matt Forsyth 9/17/2024
Documents
File Name Date File Size