| Septic Release Inspection |
|
Health Dept |
10/5/2023 |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Under Pinning Insulation Needs To Be Repaired, Holes In Floor Need Repaired, No Working Bathroom, Or Kitchen |
Anthony Aslan |
10/23/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Flooded Driveway |
Anthony Aslan |
8/12/2024 |
| Failed: Engineering - Setbacks |
Flooded Driveway |
Anthony Aslan |
8/12/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Anthony Aslan |
11/26/2024 |
| Release to power company |
|
Anthony Aslan |
11/26/2024 |
| Passed: Engineering - Setbacks |
Appears Within Setbacks |
Anthony Aslan |
11/26/2024 |