Mobile Home
Permit
| Application #: | 62767 |
| Permit #: |
000048486 |
| Related Permit: |
|
| Submitted: | Wednesday, September 27, 2023 |
| Issued: | Tuesday, October 24, 2023 |
| Expires: | Tuesday, November 26, 2024 |
| Completed: | Tuesday, November 26, 2024 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
ONE FOOT ABOVE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0401C |
| Mobile Home is a: |
Double Wide |
| Year Built |
1991 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
42 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
103402 |
| Special temporary use permit number: |
stup2306-35 |
| Septic # |
23-0212 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
Yes |
| Serial # |
flhml2f2401-0417220ab |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 9/27/2023 |
Point Review - Reviewed |
| 10/4/2023 |
Plan Review - Reviewed |
| 10/5/2023 |
Zoning Review - Reviewed |
| 10/5/2023 |
Final Review - Documents Required |
| 10/9/2023 |
Final Review - Documents Required |
| 10/24/2023 |
Final Review - Reviewed |
| 10/24/2023 |
Final Review - Payment Needed |
| 10/24/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Dale Houston Dale Houstons Mobile Home Set Up And Service
|
IH1133271 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
10/5/2023 |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Under Pinning Insulation Needs To Be Repaired, Holes In Floor Need Repaired, No Working Bathroom, Or Kitchen |
Anthony Aslan |
10/23/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Flooded Driveway |
Anthony Aslan |
8/12/2024 |
| Failed: Engineering - Setbacks |
Flooded Driveway |
Anthony Aslan |
8/12/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Anthony Aslan |
11/26/2024 |
| Release to power company |
|
Anthony Aslan |
11/26/2024 |
| Passed: Engineering - Setbacks |
Appears Within Setbacks |
Anthony Aslan |
11/26/2024 |