| Passed: Engineering - Setbacks |
|
Gary Pitzer |
3/28/2024 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
No Bond Jumper Between Manufactured Units, No Septic Release, Drive Approval |
Gary Pitzer |
3/28/2024 |
| Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection |
|
Gary Pitzer |
4/2/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
4/2/2024 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Bond Wire Under Unit Per Photo On File |
Gary Pitzer |
4/2/2024 |
| Release to power company |
|
Gary Pitzer |
4/2/2024 |
| Septic Release Inspection |
|
Health Dept |
4/2/2024 |