Permit Details

Permit Search

Permit

New Residential Construction

125 SW PINEHURST DR
LAKE CITY, FL 32024

Permit #
000048410
Application #
62714
Status Completed
  1. Submitted Sep 21, 2023
  2. Issued Feb 16, 2024
  3. Expires Jan 19, 2025
  4. Completed Jul 23, 2024

Property

Parcel #
03087-101
Owner
Sparks Construction And Design
Acres
0.66
Subdivision
Forest Country Sixth Addition
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
106'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
25' (2nd front)
Setback Side 2
10'
Setbacks Rear
10' (2nd side)
Stories
1
Heated Area (Sqft)
2031
Total Area (Sqft)
3428
Building Height
22.8
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0660
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
220

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Corrections Needed
  11. Zoning Review - Reviewed
  12. Final Review - Documents Required
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Permit Reissued
  17. Final Review - Payment Needed

Contractors

  • Josh Sparks

    Sparks Construction

    License
    CBC1252260
    Title
    Building Contractor
    Role
    Contractor
  • Ralph W Laverdure

    Rwl Roofing Llc

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Benjamin L Sparks

    Line Electric Company Llc

    License
    EC13009101
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Oct 12, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 25, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Oct 25, 2023

    Passed: Engineering - Setbacks

    No Portalet On Site For Footing Inspection

    Inspected by Matt Forsyth

  4. Nov 20, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  5. Nov 20, 2023

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  6. Nov 20, 2023

    Release to power company

    Inspected by Gary Pitzer

  7. Nov 20, 2023

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Gary Pitzer

  8. Dec 1, 2023

    Failed: Building - Slab

    Perimeter 5 Bar Needs To Be Tied Up Off The Concrete Block Pictures Will Suffice

    Inspected by Matt Forsyth

  9. Feb 6, 2024

    Passed: Building - Slab

    Item Addressed

    Inspected by Matt Forsyth

  10. Feb 14, 2024

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Feb 14, 2024

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  12. Feb 14, 2024

    Failed: Building - Ext Strapping/Wall Sheathing

    Post Base Need To Have The Correct Nail Size

    Inspected by Matt Forsyth

  13. Feb 14, 2024

    Failed: Building - Framing

    Not Complete

    Inspected by Matt Forsyth

  14. Mar 1, 2024

    Failed: Building - Framing

    Exterior Doors And Windows Need To Be Completed. Garage 2 Ply Truss Nailing Not Complete Some King Studs Do Not Have Proper Nailing

    Inspected by Matt Forsyth

  15. Mar 1, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Mar 1, 2024

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  17. Mar 1, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  18. Mar 8, 2024

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  19. Mar 8, 2024

    Passed: Building - Framing

    Inspected by Matt Forsyth

  20. Apr 23, 2024

    Release to power company

    Inspected by Matt Forsyth

  21. May 15, 2024

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  22. May 15, 2024

    Release to power company

    Inspected by Matt Forsyth

  23. Jul 18, 2024

    Passed: Building - Final

    1. Needs Final Drive Inspection, 2. Cover On Fireplace Fresh Air On Rear Porch

    Inspected by Gary Pitzer

  24. Jul 23, 2024

    Passed: Building - Final

    Drive Completed And Cover Installed At Rear Porch

    Inspected by Gary Pitzer

Documents