Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Solar Power System Permit

Address 190 SW CAMPHOR CT
LAKE CITY, FL 32024
Parcel #: 02732-305
Acres: 0.48
Owner: Owen Farhod,
Subdivision: Laurel Lake Phase 3
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 62375
Permit #: 000048353
Related Permit:
Submitted: Friday, August 25, 2023
Issued: Friday, October 6, 2023
Expires: Wednesday, April 3, 2024
Completed:
Status: Permit Issued
Septic Release? na
Notes:

LAKE CITY UTLITY CUSTOMER SERVICE NOTES If digging is required; locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
Finished floor requirement
Fema map number 12023C0485C
This is the construction of a SFD, UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 1841.00
Total Area (Sqft) 2572.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0683
Review Notes
8/25/2023 Application pending.
8/25/2023 Application submitted by applicant.
8/25/2023 City of Lake City Utilities Notified
8/29/2023 Point Review - Printed-Online Application
8/29/2023 Point Review - Reviewed
9/5/2023 Plan Review - Documents Required
9/11/2023 Plan Review - On Hold-Incomplete
9/18/2023 Plan Review - On Hold-Incomplete
9/25/2023 Plan Review - On Hold-Incomplete
10/2/2023 Plan Review - Reviewed
10/5/2023 Zoning Review - Reviewed
10/5/2023 Final Review - Payment Needed
10/6/2023 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Documents
File Name Date File Size