Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 334 E DUVAL ST
LAKE CITY, FL 32055
Parcel #: 13226-000
Acres: 0.31
Owner: Duval 334 Land Trust Dated 5/4/22,
Subdivision:
Zoning:
Flood Zone: X
District: 1
Application #: 61795
Permit #: 000048319
Related Permit:
Submitted: Friday, July 7, 2023
Issued: Tuesday, October 3, 2023
Expires: Friday, December 15, 2023
Completed: Friday, December 15, 2023
Status: Completed
Septic Release? na
Notes:
PICS AND AFFIDAVIT REC'D
LAKE CITY ZONING NOTES Emailed historic application on 07/07. Historic application received and approved on consent agenda. LAKE CITY CODE ENFORCEMENT CASE NOTES None
Job Details
Finished floor requirement
Fema map number 12023C0284D
Type Roofing Job Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Replace wood as needed
Type of structure Commercial Building
Commercial or Residential Commercial
Roof Area (for this job) Sq Ft 36
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Metal
Florida Product Approval Number FL13838-1
Product Manufacturer Agrimetal
Product Description 29 GA Rib
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Tear off use existing purlins replace purlins as needed.
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Documents
File Name Date File Size