- Finished floor requirement
-
- Fema map number
- 12023C0313D
- Type Roofing Job
- Re-Cover - New Material over Existing
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Metal re-roof
- Type of structure
- House
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 2400
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Is the existing roof being removed?
- Yes
- Type of New Roofing Product
- Metal
- Florida Product Approval Number
- 4595.17
- Product Manufacturer
- Tri-County Metals
- Product Description
- Ultra Rib metal over 1x4 purlins over ply/shingles
- Building Code Edition
- 2020 Florida Building Code 7th Edition and Florida Statute 553.844
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- We are not getting down to that level. Just taking metal off and putting metal back down.
- Ventilation:
- Ridge Vent
- Flashing:
- Replace All
- Drip Edge:
- Replace All
- Valley Treatment:
- New Metal
- Any cable and/or race-way wiring located on or within the roof assembly?
- No