Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/19/2023 |
Passed: Electrical - 1st Underground Rough–In |
|
Matt Forsyth |
10/2/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
10/2/2023 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
10/2/2023 |
Release to power company |
|
Matt Forsyth |
10/2/2023 |
Passed: Building - Slab |
|
Matt Forsyth |
10/4/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
12/5/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
Check Gable Strapping On The Framing Inspection |
Matt Forsyth |
12/5/2023 |
Failed: Building - Strapping |
Gable Straps Covered With Siding
|
Matt Forsyth |
1/10/2024 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
1/10/2024 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
1/10/2024 |
Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete |
Matt Forsyth |
1/10/2024 |
Passed: Building - Framing |
|
Matt Forsyth |
1/10/2024 |
Passed: Building - Strapping |
|
Matt Forsyth |
1/11/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
1/11/2024 |
Passed: Building - Insulation |
Insulation Complete |
Matt Forsyth |
1/17/2024 |
Septic Release Inspection |
|
Health Dept |
3/22/2024 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
4/8/2024 |
Release to power company |
|
Matt Forsyth |
4/8/2024 |
Failed: Engineering - Final Driveway |
Erosion At Mess Needs To Be Repaired |
Smith, Blake |
5/2/2024 |
Failed: Building - Final |
Co Held Up For Driveway Completion |
Matt Forsyth |
5/2/2024 |
Failed: Building - Final |
Need To Request Drive Final |
Troy Crews |
5/3/2024 |
Passed: Engineering - Final Driveway |
Minimum 32ftx18xin Round Corrigated Metal Culvert With Concrete Mitered Ends With 6x6 Welded Wire Or Culvert Bolts With 4 In Of Limerock On Top Of Pipe For Cover. |
Smith, Blake |
5/6/2024 |
Passed: Building - Final |
|
Matt Forsyth |
5/7/2024 |