Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 147 SW CHRISTENSEN CT
LAKE CITY, FL 32024
Parcel #: 03026-115
Acres: 0.99
Owner: Lev Joann T, Fochi William A
Subdivision: Kimberly Oaks
Zoning: RR
Flood Zone: X
District: 3
Application #: 61934
Permit #: 000048105
Related Permit: Culvert: 000048104
Submitted: Tuesday, July 18, 2023
Issued: Wednesday, September 13, 2023
Expires: Wednesday, May 1, 2024
Completed: Wednesday, May 1, 2024
Status: Completed
Septic Release? Yes
Notes:
MFE 102.5' PER PLAT - SURVEYOR LETTER CONFIRMATION BY NAILING INSPECTION ELEVATION CONFIRMATION REC'D @ 103.44'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 102.5'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1776
Total Area (Sqft) 2424
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 23-0172
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
7/18/2023 Application pending.
7/18/2023 Application submitted by applicant.
7/24/2023 Point Review - Printed-Online Application
7/31/2023 Plan Review - Corrections Needed
7/31/2023 Plan Review - Building Approved
7/31/2023 Plan Review - Electrical Approved
7/31/2023 Plan Review - Mechanical Approved
7/31/2023 Plan Review - Plumbing Approved
7/31/2023 Plan Review - Fuel/Gas Approved
8/9/2023 Zoning Review - Corrections Needed
8/18/2023 Zoning Review - Reviewed
9/13/2023 Final Review - Payment Needed
9/13/2023 Permit Issued
Contractors
Name/ Business License Title Role
Joann T Lev
Exceptions Realty Llc
Liability Insurance & Workers Comp Expired.
CRC1329719 Cert. Residential Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Dana D Johnson
Mac Johnson Roofing Inc Dba Gulf Coast Metal Roofing
CCC1325497 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Anthony R Franks
Lane Heating & Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Smith, Blake 9/14/2023
Passed: Building - Footer Matt Forsyth 10/27/2023
Passed: Engineering - Setbacks Matt Forsyth 10/27/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Gary Pitzer 11/21/2023
Passed: Building - Slab Nice Work Matt Forsyth 11/29/2023
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 1/12/2024
Passed: Building - Roof Decking Matt Forsyth 1/12/2024
Passed: Building - Framing Nice Work Matt Forsyth 1/17/2024
Passed: Electrical - 2nd Rough-In Matt Forsyth 1/31/2024
Passed: Mechanical - Rough In Matt Forsyth 1/31/2024
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 1/31/2024
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Water Tested Matt Forsyth 1/31/2024
Passed: Building - Insulation Spray Foam Added Batten Insulation Walls Matt Forsyth 2/15/2024
Passed: Electrical - Permanent Power Need Septic Release Matt Forsyth 4/1/2024
Release to power company Melissa Garber 4/5/2024
Septic Release Inspection Health Dept 4/5/2024
Passed: Engineering - Final Driveway Smith, Blake 4/8/2024
Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection Smith, Blake 4/8/2024
Passed: Building - Final Matt Forsyth 5/1/2024
Documents
File Name Date File Size