6/5/2023
|
Point Review - On Hold-Incomplete
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENV HEALTH SIGNED SITE PLAN APPROVAL
*BLOWER DOOR TEST
*ENGINEER ELEVATION LETTER
|
6/5/2023
|
Final Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENV HEALTH SIGNED SITE PLAN APPROVAL
*BLOWER DOOR TEST
*ENGINEER ELEVATION LETTER
|
6/5/2023
|
Final Review - On Hold-Incomplete
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENV HEALTH SIGNED SITE PLAN APPROVAL
*BLOWER DOOR TEST
*ENGINEER ELEVATION LETTER
|
6/27/2023
|
Plan Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENV HEALTH SIGNED SITE PLAN APPROVAL
*BLOWER DOOR TEST
*ENGINEER ELEVATION LETTER
|
6/29/2023
|
Final Review - On Hold-Incomplete
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENGINEER ELEVATION LETTER
|
6/30/2023
|
Plan Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENGINEER ELEVATION LETTER
|
7/3/2023
|
Plan Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENGINEER ELEVATION LETTER
|
7/6/2023
|
Plan Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENGINEER ELEVATION LETTER
|
7/14/2023
|
Plan Review - Documents Required
NEEDED:
*SUB FORM SIGNATURES-- DUE TO LETTERS NOT BEING SIGNED
*ENGINEER LETTER MUST STATE THAT BUILDING ACCEPTABLE AS IS FOR HABITABLE STRUCTURE-- CURRENT LETTER IS FOR FOUNDATION ONLY
*ENGINEER ELEVATION LETTER
|
7/24/2023
|
Plan Review - Plumbing Approved
NEEDED:
*ENGINEER ELEVATION LETTER PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/24/2023
|
Plan Review - Mechanical Approved
NEEDED:
*ENGINEER ELEVATION LETTER PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/24/2023
|
Plan Review - Electrical Approved
NEEDED:
*ENGINEER ELEVATION LETTER PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/24/2023
|
Plan Review - Building Approved
NEEDED:
*ENGINEER ELEVATION LETTER PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/24/2023
|
Plan Review - Reviewed
NEEDED:
*ENGINEER ELEVATION LETTER PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/24/2023
|
Zoning Review - Documents Required
NEEDED:
*ENGINEER ELEVATION LETTER NEEDED, PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
7/26/2023
|
Final Review - Documents Required
NEEDED:
*ENGINEER ELEVATION LETTER NEEDED, PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
8/25/2023
|
Final Review - Documents Required
NEEDED:
* ENGINEER ELEVATION LETTER NEEDED, PLAT CALLS FOR 89 ELEVATION EXISING GRADE IS LOWER
|
9/1/2023
|
Zoning Review - Reviewed
|
9/1/2023
|
Final Review - Reviewed
|
9/1/2023
|
Final Review - Payment Needed
|
9/1/2023
|
Permit Issued
Permit #000048018 created and approved.
|