Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
Install Min, 24’× 18 " Corr Metal Culvert W / Concrete Mitred Ends, W / 6 " × 6 " Welded Wire, Rebar Or Culvert Bolts In Mitred Ends, Concrete Mitred Ends W - 4ft X L - 5ft, And With 4 Inches Of Limerock On Top Cover |
Smith, Blake |
8/25/2023 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
10/19/2023 |
Release to power company |
|
Matt Forsyth |
10/19/2023 |
Passed: Building - Footer |
|
Matt Forsyth |
10/26/2023 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/26/2023 |
Passed: Electrical - 1st Underground Rough–In |
|
Gary Pitzer |
11/21/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Gary Pitzer |
11/21/2023 |
Passed: Building - Slab |
Nice Work |
Matt Forsyth |
11/29/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
1/12/2024 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
1/12/2024 |
Passed: Building - Framing |
Nice Work |
Matt Forsyth |
1/17/2024 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
1/31/2024 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
1/31/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
1/31/2024 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Water Tested |
Matt Forsyth |
1/31/2024 |
Passed: Building - Insulation |
Spray Foam Attic Space Batten Insulation Walls |
Matt Forsyth |
2/15/2024 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Matt Forsyth |
4/1/2024 |
Release to power company |
|
Melissa Garber |
4/5/2024 |
Septic Release Inspection |
|
Health Dept |
4/5/2024 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/8/2024 |
Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection |
|
Smith, Blake |
4/8/2024 |
Passed: Building - Final |
|
Matt Forsyth |
6/13/2024 |