Mobile Home
Permit
| Application #: | 61999 |
| Permit #: |
000047965 |
| Related Permit: |
|
| Submitted: | Tuesday, July 25, 2023 |
| Issued: | Wednesday, August 23, 2023 |
| Expires: | Thursday, December 28, 2023 |
| Completed: | Thursday, December 28, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
MFE=1' ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0290D |
| In floodway |
N |
| Mobile Home is a: |
Triple Wide |
| Year Built |
2024 |
| Width (Ft.In) |
45 |
| Length (Ft.In) |
76 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
103582 |
| Septic # |
22-0789 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
DVAL12411065ABC |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 7/25/2023 |
Application pending. |
| 7/25/2023 |
Application submitted by applicant. |
| 7/27/2023 |
Point Review - Printed-Online Application |
| 7/27/2023 |
Point Review - Reviewed |
| 8/4/2023 |
Plan Review - Reviewed |
| 8/16/2023 |
Zoning Review - Reviewed |
| 8/23/2023 |
Final Review - Reviewed |
| 8/23/2023 |
Final Review - Payment Needed |
| 8/23/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ernest S Johnson Dependable Mobile Home Service
|
IH1025249 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Timothy D Shatto Shatto Heating & Air, Inc.
|
CAC057875 |
A/c Class B |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Final Dirt Grade Not Been Done Need Septic Release |
Matt Forsyth |
12/19/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/19/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Final Dirt Grade Was Completed, Power Will Be Released When Final Septic Received |
Matt Forsyth |
12/28/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/28/2023 |
| Release to power company |
|
Melissa Garber |
1/9/2024 |
| Septic Release Inspection |
|
Health Dept |
1/9/2024 |