| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Setbacks |
Appears To Meet Setbaacks |
Gary Pitzer |
8/24/2023 |
| Passed: Building - Footer |
|
Gary Pitzer |
8/24/2023 |
| Passed: Engineering - Initial Driveway |
Install Min, 24’× 18 " Corr Metal Culvert W / Concrete Mitred Ends, W / 6 " × 6 " Welded Wire, Rebar Or Culvert Bolts In Mitred Ends, Concrete Mitred Ends W - 4ft X L - 5ft, And With 4 Inches Of Limerock On Top Cover |
Smith, Blake |
8/25/2023 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Drains And Vents Stubs, Under Slab Water Lines |
Gary Pitzer |
10/6/2023 |
| Passed: Building - Slab |
Plastic And Taped, Rebar And Wire |
Gary Pitzer |
10/12/2023 |
| Failed: Building - Ext Strapping/Wall Sheathing |
Nails Missing In Multiple Places And Roof Deck Missing Nails |
Anthony Aslan |
12/14/2023 |
| Passed: Building - Roof Decking |
|
Troy Crews |
12/15/2023 |
| Passed: Building - Wall Sheathing |
|
Troy Crews |
12/15/2023 |
| Failed: Building - Framing |
1. Missing Truss Straps, 2. Several All Thread Hold Down Bolts Need To Be Tighter, 3.bracket For Hold Down At Garage Door Missing |
Gary Pitzer |
12/27/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
1/16/2024 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
1/16/2024 |
| Passed: Building - Framing |
|
Gary Pitzer |
1/16/2024 |
| Failed: Electrical - 2nd Rough-In |
Need Uf Cable Under Slab To Island, Call This In With Insulation |
Gary Pitzer |
1/16/2024 |
| Passed: Building - Insulation |
|
Gary Pitzer |
2/21/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
2/21/2024 |
| Cancelled: Electrical - Utility Pole Final |
|
Melissa Garber |
11/26/2024 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
11/27/2024 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
11/27/2024 |
| Release to power company |
Rec'd Septic |
Anthony Aslan |
12/2/2024 |
| Septic Release Inspection |
|
Health Dept |
12/2/2024 |