Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 607 NW QUINTEN ST
LAKE CITY, FL 32055
Parcel #: 05068-000
Acres: 38.47
Owner: Columbia County, Florida
Subdivision:
Zoning: I
Flood Zone: X
District: 1
Application #: 62245
Permit #: 000047928
Related Permit:
Submitted: Tuesday, August 15, 2023
Issued: Friday, August 18, 2023
Expires: Monday, February 24, 2025
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0284D
Type of Structure Other
Commercial or Residential? Commercial
Description of the work being performed: Remove and replace all (5) walk in refrigeration boxes with (2) box units of equal total Sqft.
Dev Permit # F023-
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Service Amps 0
Review Notes
8/15/2023 City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER.
8/18/2023 Permit Issued Permit #000047928 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 8/22/2023
Passed: Building - Monolithic Slab Building Pirtion Troy Crews 11/2/2023
Passed: Engineering - Setbacks Troy Crews 11/2/2023
Passed: Building - Framing Troy Crews 2/8/2024
Passed: Electrical - Permanent Power Troy Crews 2/8/2024
Release to power company Troy Crews 2/8/2024
Rescheduled 8/15/2024:Building - Framing Troy Crews 8/14/2024
Passed: Building - Framing Floor And Wall Framing For Office Area Troy Crews 8/15/2024
Passed: Electrical - 2nd Rough-In Troy Crews 8/28/2024
Documents
File Name Date File Size