Inspection |
Notes |
Performed By |
Date |
Passed: Fire - Plan Review |
|
Shane Overstreet |
8/4/2023 |
Passed: Building - Footer |
All Interiors Except For East Row |
Troy Crews |
8/11/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/11/2023 |
Passed: Building - Footer |
5 Pier Footers East Side |
Troy Crews |
8/16/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/16/2023 |
Passed: Building - Footer |
Ne 1/3 Of Permiter Foundation |
Troy Crews |
8/18/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/18/2023 |
Passed: Building - Footer |
Peer Foundations At Existing Building |
Troy Crews |
8/22/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/22/2023 |
Passed: Building - Footer |
Patrial East Side Perimiter And Partial North At Exiting Building Piers. |
Troy Crews |
8/24/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/24/2023 |
Passed: Building - Footer |
Remainder Of East Side Perimiter With Pads, And North Pads At Existing Building. |
Troy Crews |
8/25/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/25/2023 |
Passed: Building - Footer |
Piers At North Wall |
Troy Crews |
9/5/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/5/2023 |
Passed: Building - Footer |
3 Interiors South End Wall South End |
Troy Crews |
9/7/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/7/2023 |
Passed: Building - Footer |
Perimiter At Se Corner |
Troy Crews |
9/8/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/8/2023 |
Passed: Building - Footer |
Remainder Of Perimeter Footing South End |
Troy Crews |
9/11/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/11/2023 |
Passed: Fire - Plan Review |
|
Shane Overstreet |
9/19/2023 |
Passed: Electrical - 1st Underground Rough–In |
North Side Parking Lot Conduits., Partial South Side. |
Troy Crews |
9/19/2023 |
Passed: Electrical - 1st Underground Rough–In |
Parking Lot Rough In |
Troy Crews |
9/25/2023 |
Passed: Building - Fire Rated Wall |
Tilt Wall Panels For South End |
Troy Crews |
9/27/2023 |
Passed: Building - Slab |
Stair Landings East Side Of Building |
Troy Crews |
10/2/2023 |
Passed: Building - Slab |
Stem Wall Pour East Side 3 Spots |
Troy Crews |
10/4/2023 |
Passed: Electrical - 2nd Rough-In |
4 Bases 10 Ft Deep With Cage |
Troy Crews |
10/4/2023 |
Passed: Electrical - 1st Underground Rough–In |
Light Bases |
Troy Crews |
10/6/2023 |
Passed: Electrical - 2nd Rough-In |
Ligh Base Conduits. |
Troy Crews |
10/10/2023 |
Passed: Building - Slab |
Sections Of Parking Lot |
Troy Crews |
10/19/2023 |
Passed: Building - Footer |
Anchor Plates Bottom Of Tilt Wall Anchors Being Installed To Footer |
Troy Crews |
11/1/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/1/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Drains For Fire Room And And Drain For Existing Compressor Room. |
Troy Crews |
11/16/2023 |
Passed: Building - Masonry Wall Reinforcing |
Sump Pit Footer |
Troy Crews |
11/21/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Drains For Commpresors |
Troy Crews |
11/21/2023 |
Passed: Building - Monolithic Slab |
Compressor Room Slab |
Troy Crews |
11/29/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/29/2023 |
Passed: Building - Slab |
Last Parking Lot And Slab For Railroad Car |
Troy Crews |
12/5/2023 |
Passed: Building - Footer |
Loading Dock Stairs, Walls |
Troy Crews |
12/8/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/8/2023 |
Passed: Building - Slab |
1 St Tie In From Parking Lot Toward Builing, Inside Slab E- Mail Pictures |
Troy Crews |
12/13/2023 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
12/15/2023 |
Passed: Fire - Plan Review |
|
Cpt.shane Overstreet |
12/18/2023 |
Passed: Building - Slab |
Front Break Area |
Troy Crews |
12/19/2023 |
Passed: Plumbing/Gas - Sanitary |
Gang Bath Area |
Troy Crews |
1/3/2024 |
Passed: Building - Slab |
First Two Sections Of 10 Inch Slab |
Troy Crews |
1/4/2024 |
Passed: Building - Insulation |
Gang Bath Hot Water Lines |
Troy Crews |
1/5/2024 |
Passed: Building - Slab |
|
Troy Crews |
1/12/2024 |
Passed: Plumbing/Gas - Water Pipe |
Gang Bath Water ,llines |
Troy Crews |
1/12/2024 |
Rescheduled 1/17/2024:Electrical - 1st Underground Rough–In |
|
Troy Crews |
1/16/2024 |
Passed: Electrical - 1st Underground Rough–In |
Also Driveway Foundations |
Troy Crews |
1/17/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
120 Psi Test |
Troy Crews |
1/17/2024 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
1/18/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/22/2024 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
2/9/2024 |
Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
2/22/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
3/12/2024 |
Passed: Fire - Aboveground Sprinkler - Visual (On Site) |
|
Cpt.shane Overstreet |
3/21/2024 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
3/22/2024 |
Passed: Building - Final |
|
Troy Crews |
5/1/2024 |
Passed: Fire - Fire Final |
|
Cpt. Shane Overstreet |
5/21/2024 |
Passed: Building - Footer |
Smoking Pavilion Footers |
Troy Crews |
5/22/2024 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/22/2024 |
Passed: Building - Final |
Four Areas Complete |
Troy Crews |
5/22/2024 |
Passed: Building - Final |
|
Cpt. Shane Overstreet |
6/21/2024 |
Passed: Fire - Fire Final |
|
Cpt. Shane Overstreet |
6/21/2024 |
Passed: Fire - Operational Test - Sprinkler/Standpipe |
Checked On 6/21/24 All In Working Order. |
Cpt. Shane Overstreet |
6/21/2024 |
Rescheduled 7/11/2024:Building - Final |
|
Troy Crews |
7/8/2024 |
Passed: Building - Final |
|
Troy Crews |
7/11/2024 |