Permit Details

Permit Search

Permit

New Residential Construction

128 SW KING ARTHURS GLN
LAKE CITY, FL 32024

Permit #
000047836
Application #
61788
Status Completed
  1. Submitted Jul 6, 2023
  2. Issued Aug 7, 2023
  3. Expires Jul 1, 2024
  4. Completed Jan 3, 2024

Property

Parcel #
03099-210
Owner
Cornerstone Developers Ii Llc
Acres
0.51
Subdivision
Stonehenge Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
101.35
Requirement needed
By Nailing Inspection
Document needed is
the Engineers letter confirming their requirements
Document receieved
Yes
Fema map number
12023C0289D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
25' (2ND FRONT)
Stories
1
Heated Area (Sqft)
1977
Total Area (Sqft)
2710
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0556
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
  2. Point Review - Received-Hard Copy Application
  3. Point Review - Reviewed
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued
  13. Final Review - Payment Needed

Contractors

  • Jerry Castagna

    Castagna Construction Inc

    License
    CBC047842
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Derrick L Williams

    Dl Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Frank Soucinek

    Dependable Plumbing

    License
    CFC057747
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Workers Comp & Employees Workers Comp Expired.

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Aug 7, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Done On 7-27-23

    Inspected by Troy Crews

  2. Aug 8, 2023

    Rescheduled 8/8/2023:Building - Slab

    Inspected by Troy Crews

  3. Aug 8, 2023

    Passed: Building - Monolithic Slab

    Corner Bar Suggested At Curbs In Garage.

    Inspected by Matt Forsyth

  4. Aug 8, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Aug 8, 2023

    Passed: Building - Slab

    Inspected by Matt Forsyth

  6. Aug 22, 2023

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  7. Aug 22, 2023

    Release to power company

    Inspected by Matt Forsyth

  8. Sep 27, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Sep 27, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Sep 27, 2023

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Oct 16, 2023

    Passed: Building - Framing

    Inspected by Matt Forsyth

  12. Oct 16, 2023

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  13. Oct 16, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Oct 16, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  15. Oct 16, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Oct 16, 2023

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Tested

    Inspected by Matt Forsyth

  17. Oct 19, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  18. Dec 4, 2023

    Passed: Electrical - Permanent Power

    Need Septic And Driveway

    Inspected by Matt Forsyth

  19. Dec 7, 2023

    Septic Release Inspection

    Inspected by Health Dept

  20. Dec 8, 2023

    Release to power company

    Inspected by Melissa Garber

  21. Dec 28, 2023

    Failed: Building - Final

    Work Not Complete

    Inspected by Matt Forsyth

  22. Jan 3, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth