Permit Details

Permit Search

Permit

Mobile Home

537 SW GAINER DR
LAKE CITY, FL 32024

Permit #
000047830
Application #
61918
Status Completed
  1. Submitted Jul 18, 2023
  2. Issued Aug 7, 2023
  3. Expires Feb 28, 2024
  4. Completed Sep 1, 2023

Property

Parcel #
03707-116
Owner
Duncan Charles Shane
Acres
5.01
Subdivision
Paradise South
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0395C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2024
Width (Ft.In)
32
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
98883
Septic #
23-0170
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
des290ga13169ab
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Reviewed
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1025142
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Aug 1, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 1, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need House Panelbox Wired To Utility

    Inspected by Matt Forsyth

  3. Sep 1, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Sep 1, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Sep 1, 2023

    Release to power company

    Inspected by Matt Forsyth

  6. Sep 1, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth