Permit Details

Permit Search

Permit

Roof Replacement or Repair

526 SW SISTERS WELCOME RD
LAKE CITY, FL 32025

Permit #
000047800
Application #
61980
Status Completed
  1. Submitted Jul 21, 2023
  2. Issued Aug 1, 2023
  3. Expires Mar 30, 2024
  4. Completed Oct 2, 2023

Property

Parcel #
02668-001
Owner
Carc Advocates For Citizens With Disabilities Inc,
Acres
0.48
Subdivision
—
Zoning
I
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0291D
Type Roofing Job
Other
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
26 gauge galvalume PBR Panels
Type of structure
Commercial Building
Commercial or Residential
Commercial
Roof Area (for this job) Sq Ft
4600
No. of Stories
1
Roof Pitch
Less than 2:12
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Going over existing PBR panels with roof hugger perlin system, then installing new PBR panels
Type of New Roofing Product
Other
Florida Product Approval Number
9903.2R5
Product Manufacturer
Tri-County Metals
Product Description
PBR Panels
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
no underlayment; new product on existing metal roof with roof hugger system
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Final Review - Payment Needed
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Kevin L Bedenbaugh Jr

    Plumb Level Construction Co Llc

    License
    CCC1329482
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Sep 21, 2023

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  2. Oct 2, 2023

    Passed: Re-Roof - Final

    Inspected by Troy Crews

  3. Requested

    Re-Roof - Final

    Awaiting inspection