Mobile Home
Permit
| Application #: | 61601 |
| Permit #: |
000047675 |
| Related Permit: |
|
| Submitted: | Monday, June 19, 2023 |
| Issued: | Friday, July 14, 2023 |
| Expires: | Thursday, November 9, 2023 |
| Completed: | Thursday, November 9, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0115C |
| Mobile Home is a: |
Double Wide |
| Year Built |
2023 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
72 |
| Driveway access to home: |
Culvert Permit |
| Installation Decal # |
102278 |
| Septic # |
23-0484 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA10023470AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 6/19/2023 |
Application pending. |
| 6/19/2023 |
Application submitted by applicant. |
| 6/22/2023 |
Point Review - On Hold-Incomplete |
| 7/14/2023 |
Plan Review - Reviewed |
| 7/14/2023 |
Point Review - Reviewed |
| 7/14/2023 |
Zoning Review - Reviewed |
| 7/14/2023 |
Final Review - Processing |
| 7/14/2023 |
Final Review - Reviewed |
| 7/14/2023 |
Final Review - Payment Needed |
| 7/14/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Rodney A Carmichael Set Right Mobile Homes Llc
|
IH1025656 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Ronald E Bonds Sr Style Crest Inc
|
CAC1817658 |
Class "b" A/c Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Gate Locked, No Access |
Gary Pitzer |
11/8/2023 |
| Failed: Engineering - Setbacks |
No Access |
Gary Pitzer |
11/8/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
11/9/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Gary Pitzer |
11/9/2023 |
| Release to power company |
|
Gary Pitzer |
11/9/2023 |
| Cancelled: Mobile Home - Mobile Home Set-Up Final |
|
Gary Pitzer |
11/9/2023 |
| Cancelled: Engineering - Setbacks |
|
Gary Pitzer |
11/9/2023 |
| Septic Release Inspection |
|
Health Dept |
11/28/2023 |