Permit Details

Permit Search

Permit

Roof Replacement or Repair

826 SW AMBERWOOD LOOP
LAKE CITY, FL 32025

Permit #
000047671
Application #
61780
Status Completed
  1. Submitted Jul 6, 2023
  2. Issued Jul 14, 2023
  3. Expires Mar 5, 2024
  4. Completed Sep 7, 2023

Property

Parcel #
08063-007
Owner
Cs Amberwood Hills Llc,
Acres
3.75
Subdivision
—
Zoning
—
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0292D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Tear off existing roof and install new asphalt shingles (1/2 of roof)
Type of structure
Commercial Building
Commercial or Residential
Commercial
Roof Area (for this job) Sq Ft
33
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL16305-R10
Product Manufacturer
Atlas Roofing Corporation
Product Description
Fiberglass Reinforced Laminated
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City
  4. Final Review - Documents Required
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Daniel Dufresne

    Covenant Roofing & Construction Inc

    License
    CCC1332763
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Aug 28, 2023

    Cancelled: Re-Roof - In Progress

    Inspected by Gary Pitzer

  2. Aug 31, 2023

    Passed: Re-Roof - In Progress

    In Progress With Tear Off

    Inspected by Gary Pitzer

  3. Sep 7, 2023

    Passed: Re-Roof - Final

    Inspected by Gary Pitzer