Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 159 SW GOVERNORS GLN
LAKE CITY, FL 32024
Parcel #: 03406-106
Acres: 2.50
Owner: Hart Isaac, Hart Marlene
Subdivision: Rose Creek Plantation Phase 1
Zoning: A-3
Flood Zone: X
District: 5
Application #: 61455
Permit #: 000047638
Related Permit: Culvert: 000047639
Submitted: Wednesday, June 7, 2023
Issued: Tuesday, July 11, 2023
Expires: Tuesday, January 2, 2024
Completed: Tuesday, January 2, 2024
Status: Completed
Septic Release? No
Notes:
THIS LOT IS PART OF SFLP2106 MFE= 1' ABOVE THE ROAD
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0383D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 2701
Total Area (Sqft) 3970
Building Height 24
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 23-0420
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps 400
Review Notes
6/6/2023 Application pending.
6/7/2023 Application submitted by applicant.
6/8/2023 Point Review - Printed-Online Application NEEDED: *ENV HEALTH SIGNED SITE PLAN APPROVAL OR CITY UTILITY AVAILABILITY LETTER *RESIDENTIAL CHECKLIST *STRUCTURAL ENGINEERING **PRIOR TO INSPECTIONS*** RECORDED NOC
6/8/2023 Point Review - Reviewed NEEDED: *ENV HEALTH SIGNED SITE PLAN APPROVAL OR CITY UTILITY AVAILABILITY LETTER *RESIDENTIAL CHECKLIST *STRUCTURAL ENGINEERING **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Corrections Needed NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Building Approved NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Electrical Approved NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Mechanical Approved NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Plumbing Approved NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Fuel/Gas Approved NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/21/2023 Plan Review - Reviewed NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/27/2023 Plan Review - Documents Required NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/27/2023 Zoning Review - Reviewed NEED: **ENERGY FORM AND MANUAL J, NEED TO BE SEER2 COMPLIANT (NEED BEFORE FINAL REVIEW)AA **PRIOR TO INSPECTIONS*** RECORDED NOC
6/30/2023 Final Review - Processing NEED: **PRIOR TO INSPECTIONS*** RECORDED NOC
7/11/2023 Permit Issued Permit #000047638 created and approved.
12/6/2023 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
James Zuber
All Seasons Planning, Inc.
CGC1517099 General Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Anthony R Franks
Lane Heating & Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Electrical -1st Underground Rough–In Electric Bond To Rebar Gary Pitzer 7/17/2023
Passed: Electrical - Temporary Service Gary Pitzer 7/17/2023
Release to power company Gary Pitzer 7/17/2023
Passed: Engineering - Setbacks Gary Pitzer 7/17/2023
Passed: Building - Footer Gary Pitzer 7/17/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Drains Only Gary Pitzer 8/2/2023
Passed: Building - Slab Gary Pitzer 8/8/2023
Passed: Building - Wall Sheathing Gary Pitzer 9/5/2023
Passed: Building - Roof Decking Gary Pitzer 9/20/2023
Passed: Building - Ext Strapping/Wall Sheathing Gary Pitzer 9/22/2023
Passed: Building - Framing Gary Pitzer 9/22/2023
Passed: Building - Strapping Gary Pitzer 9/22/2023
Passed: Electrical - 2nd Rough-In Gary Pitzer 10/3/2023
Passed: Mechanical - Rough In Gary Pitzer 10/3/2023
Passed: Plumbing/Gas - 2nd Rough-In Gary Pitzer 10/3/2023
Passed: Plumbing/Gas - Tub Set/Shower Pan Gary Pitzer 10/3/2023
Passed: Building - Insulation Foam Roof , Batts Walls Gary Pitzer 10/26/2023
Passed: Electrical - Permanent Power Gary Pitzer 12/8/2023
Release to power company Gary Pitzer 12/8/2023
Passed: Building - Final Gary Pitzer 1/2/2024
Documents
File Name Date File Size