Permit Details

Permit Search

Permit

Mobile Home

5614 SW ICHETUCKNEE AVE
FORT WHITE, FL 32038

Permit #
000047509
Application #
61126
Status Completed
  1. Submitted May 10, 2023
  2. Issued Jun 21, 2023
  3. Expires Feb 6, 2024
  4. Completed Aug 10, 2023

Property

Parcel #
00490-008
Owner
Huynh Larry Long, Nguyen Terry Mai
Acres
11.00
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0460C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2023
Width (Ft.In)
48
Length (Ft.In)
28
Driveway access to home:
Existing Drive
Installation Decal #
74430
Septic #
23-0341
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
WHCO30063GAAB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Corrections Needed
  7. Zoning Review - Corrections Needed
  8. Zoning Review - Corrections Needed
  9. Zoning Review - Corrections Needed
  10. Zoning Review - Reviewed
  11. Final Review - Processing
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Aug 10, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic

    Inspected by Matt Forsyth

  2. Aug 10, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Aug 29, 2023

    Septic Release Inspection

    Inspected by Health Dept

  4. Sep 12, 2023

    Release to power company

    Rec'd Septic

    Inspected by Matt Forsyth