Permit Details

Permit Search

Permit

New Residential Construction

6148 NW LAKE JEFFERY RD
LAKE CITY, FL 32055

Permit #
000047471
Application #
61196
Status Completed
  1. Submitted May 18, 2023
  2. Issued Jun 14, 2023
  3. Expires Jul 3, 2024
  4. Completed Jan 5, 2024

Property

Parcel #
02049-108
Owner
Murphy William A
Acres
4.02
Subdivision
Rolling Oaks
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2210
Total Area (Sqft)
2677
Building Height
17
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0355
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Plan Review - Documents Required
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Point Review - Processing
  12. Point Review - Reviewed
  13. Final Review - Processing
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jun 22, 2023

    Passed: Building - Footer

    Dig Out Wash-ins

    Inspected by Anthony Aslan

  2. Jun 22, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Jun 23, 2023

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  4. Jun 23, 2023

    Release to power company

    Inspected by Anthony Aslan

  5. Jul 10, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  6. Jul 24, 2023

    Passed: Building - Slab

    Inspected by Matt Forsyth

  7. Aug 7, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Aug 7, 2023

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Sep 12, 2023

    Cancelled: Building - Framing

    Inspected by Bnztemp

  10. Sep 12, 2023

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Bnztemp

  11. Sep 12, 2023

    Cancelled: Mechanical - Rough In

    Inspected by Bnztemp

  12. Sep 12, 2023

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Bnztemp

  13. Sep 13, 2023

    Passed: Building - Framing

    Inspected by Matt Forsyth

  14. Sep 13, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Sep 13, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  16. Sep 13, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Tub Water Tested.no Pressure On Water Supply Will Check At Insulation Inspection

    Inspected by Matt Forsyth

  17. Sep 22, 2023

    Passed: Building - Insulation

    Walls Only

    Inspected by Matt Forsyth

  18. Nov 2, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  19. Nov 8, 2023

    Release to power company

    Inspected by Melissa Garber

  20. Nov 8, 2023

    Septic Release Inspection

    Inspected by Health Dept

  21. Jan 5, 2024

    Passed: Building - Final

    Step Needed Into House

    Inspected by Matt Forsyth

  22. Jan 5, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents