Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 399 SW COVEY CT
LAKE CITY, FL 32025
Parcel #: 02678-217
Acres: 0.49
Owner: Carter Tammy Lee, Carter Robert
Subdivision: Covey Court
Zoning: RSF-2
Flood Zone: X
District: 5
Application #: 60992
Permit #: 000047469
Related Permit: Culvert: 000047470
Submitted: Tuesday, May 23, 2023
Issued: Wednesday, June 14, 2023
Expires: Tuesday, December 26, 2023
Completed: Tuesday, December 26, 2023
Status: Completed
Septic Release? Yes
Notes:
MFE= 1' ABOVE THE ROAD
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0291D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 2024
Total Area (Sqft) 2820
Building Height 21
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 23-0350
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps 200
Review Notes
4/28/2023 Application pending.
5/23/2023 Application submitted by applicant.
5/23/2023 City of Lake City Utilities Notified
5/24/2023 Point Review - Printed-Online Application
6/2/2023 Plan Review - Building Approved
6/2/2023 Plan Review - Electrical Approved
6/2/2023 Plan Review - Mechanical Approved
6/2/2023 Plan Review - Plumbing Approved
6/2/2023 Plan Review - Fuel/Gas Approved
6/2/2023 Plan Review - Reviewed
6/6/2023 Zoning Review - Reviewed
6/6/2023 Final Review - Processing
6/7/2023 Final Review - Reviewed
6/7/2023 Final Review - Payment Needed
6/14/2023 Permit Issued
11/16/2023 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Homes Inc
CBC1257343 Building Contractor Contractor
Donald R Hollingsworth
Holly Electric Inc
EC13005429 Electrical Subcontractor
Anthony R Franks
Lane Heating & Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Robert Ogles
Ogles Roofing & Construction Llc
CCC1328699 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 6/21/2023
Release to power company Troy Crews 6/21/2023
Passed: Building - Footer May Need Cleaning Out The Partial Footer Underwater Troy Crews 6/21/2023
Passed: Engineering - Setbacks Troy Crews 6/21/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 7/26/2023
Passed: Building - Slab Matt Forsyth 7/31/2023
Passed: Building - Roof Decking Nice Work Matt Forsyth 8/16/2023
Passed: Building - Wall Sheathing Matt Forsyth 8/16/2023
Passed: Building - Framing H25 Girter Strapping (picture )needed Matt Forsyth 8/25/2023
Passed: Electrical - 2nd Rough-In Matt Forsyth 9/22/2023
Passed: Mechanical - Rough In Matt Forsyth 9/22/2023
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 9/22/2023
Passed: Building - Insulation Matt Forsyth 9/28/2023
Passed: Electrical - Permanent Power Septic Driveway Needed Matt Forsyth 11/17/2023
Release to power company Matt Forsyth 11/27/2023
Passed: Engineering - Final Driveway Beach, Garrett 11/27/2023
Septic Release Inspection Health Dept 11/27/2023
Passed: Building - Final Matt Forsyth 12/26/2023
Cancelled: Building - Slab Matt Forsyth 12/26/2023