| Cancelled: Mobile Home - In County Pre-Mobile Home before set-up |
|
Emaleigh Williams |
6/15/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Mobile Home Is Not Set |
Matt Forsyth |
6/15/2023 |
| Failed: Engineering - Setbacks |
|
Matt Forsyth |
6/15/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Need Compaction Test High Fill Dirt On Left End Of Home
no Power Pedestal Built, No Wire Pulled In Side Home
right End Of Home Dirt Will Allow Water To Flow Under Home
wash Outs On Front And Back Of Home |
Anthony Aslan |
8/14/2023 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
8/14/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Blocking Has Washed Out In Places No Electric Work Has Been Done Swale Needed On South End Of Home |
Matt Forsyth |
9/13/2023 |
| Cancelled: Engineering - Setbacks |
|
Matt Forsyth |
9/13/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Dirt Work Has Not Been Done As The Last Inspection Stated |
Matt Forsyth |
11/15/2023 |
| Failed: Engineering - Setbacks |
|
Matt Forsyth |
11/15/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Final |
Troy Crews |
11/22/2023 |
| Passed: Engineering - Setbacks |
Rec'd Septic |
Troy Crews |
11/22/2023 |
| Release to power company |
|
Troy Crews |
11/29/2023 |
| Certificate-Release Certificate |
Rec'd Septic Final |
Troy Crews |
11/29/2023 |
| Certificate-Release Certificate |
Rec'd Septic |
Troy Crews |
11/29/2023 |
| Septic Release Inspection |
|
Health Dept |
11/30/2023 |