Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 171 SW PLATEAU GLN
LAKE CITY, FL 32024
Parcel #: 03113-170
Acres: 0.58
Owner: Miles Wendy, Tucker Sierra
Subdivision: Wise Estates
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 61509
Permit #: 000047428
Related Permit:
Submitted: Friday, June 9, 2023
Issued: Friday, June 9, 2023
Expires: Friday, June 23, 2023
Completed: Friday, June 23, 2023
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1400
No. of Stories 1
Ventilation: Ridge Vent
Flashing: Replace with L-Flashing
Drip Edge: Replace All
Valley Treatment: New Metal
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Type of New Roofing Product Metal
Florida Product Approval Number 17992.1
Product Manufacturer capital metal
Product Description 29 g galvalume roofing
Sealed roof decking options: (Must select an option.) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Fema map number 12023C0381D
Review Notes
6/9/2023 Permit Issued Permit #000047428 created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - Final Troy Crews 6/23/2023