Failed: Electrical - Reconnect Service Final
1. Neural Needs To Be Bonded, Need Bonding Screw. 2. Neutral Conductor Wire Needs To Be One Wire Per Lug Or Hole, 3. Steel Pipe Between Disconnect And Meter Requires Bonding On Both Ends When Going Through Concentric Knock Outs,
Inspected by Gary Pitzer