Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 397 NW COUNTRY LAKE DR
LAKE CITY, FL 32055
Parcel #: 02267-602
Acres: 1.16
Owner: Morris Scott A, Morris Kimberly A
Subdivision: Country Lake In Woodborough Phase 6
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 60991
Permit #: 000047357
Related Permit: Culvert: 000047356
Submitted: Wednesday, May 10, 2023
Issued: Friday, February 16, 2024
Expires: Thursday, March 28, 2024
Completed: Thursday, March 28, 2024
Status: Completed
Septic Release? Yes
Notes:
MFE= 1' ABOVE ADJACENT GROUND FOR PERIMETER OF FOUNDATION PER ENGINEER LETTER
Job Details
Finished floor requirement
Fema map number 12023C0395C
What is the power service for? Other
Other job details: installing 400 amp service for irrigation pivots
Power Company Clay Electric
Septic # (00-0000) or (X00-000) X24-033
Electrical Code Edition 2020 National Electrical Code
Meter or Account: Meter
Number of requested AMPS for electrical service: 400
Is the power service? New Power Service
Residential or Commercial? Commercial
Review Notes
4/28/2023 Application pending.
5/10/2023 Application submitted by applicant.
5/11/2023 Point Review - Printed-Online Application
5/11/2023 Point Review - Reviewed
5/19/2023 Plan Review - Corrections Needed
5/19/2023 Plan Review - Building Approved
5/19/2023 Plan Review - Electrical Approved
5/19/2023 Plan Review - Mechanical Approved
5/19/2023 Plan Review - Plumbing Approved
5/19/2023 Plan Review - Fuel/Gas Approved
5/19/2023 Plan Review - Reviewed
5/24/2023 Zoning Review - Documents Required
5/25/2023 Zoning Review - Reviewed
5/25/2023 Final Review - Processing
5/31/2023 Final Review - Reviewed
5/31/2023 Final Review - Payment Needed
6/1/2023 Permit Issued
2/16/2024 Permit Reissued
Contractors
Name/ Business License Title Role
Josh Sparks
Sparks Construction
CBC1252260 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing Llc
CCC1328590 Roofing Contractor Subcontractor
Benjamin L Sparks
Line Electric Company Llc
EC13009101 Cert. Electrical Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Smith, Blake 6/5/2023
Passed: Engineering - Setbacks Gary Pitzer 6/9/2023
Passed: Building - Footer Steel And Bond Gary Pitzer 6/9/2023
Electrical -1st Underground Rough–In Under Slab Conduit Gary Pitzer 7/7/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Drains And Vents Only Gary Pitzer 7/7/2023
Passed: Building - Slab Steel And Plastic Sealed Gary Pitzer 7/18/2023
Cancelled: Building - Slab Gary Pitzer 7/18/2023
Passed: Electrical - Temporary Service Temp Post Gary Pitzer 8/16/2023
Release to power company Gary Pitzer 8/16/2023
Passed: Building - Roof Decking Anthony Aslan 8/23/2023
Passed: Building - Wall Sheathing Anthony Aslan 8/23/2023
Passed: Building - Framing Gary Pitzer 10/3/2023
Passed: Building - Strapping Gary Pitzer 10/3/2023
Passed: Electrical - 2nd Rough-In Gary Pitzer 10/3/2023
Passed: Mechanical - Rough In Gary Pitzer 10/3/2023
Passed: Plumbing/Gas - 2nd Rough-In Gary Pitzer 10/3/2023
Passed: Building - Insulation All Foam And Interior Sound Batted Gary Pitzer 10/27/2023
Passed: Electrical - Permanent Power Need Drive And Septic Approval Before Electric Service Release Gary Pitzer 1/17/2024
Septic Release Inspection Health Dept 2/6/2024
Release to power company Melissa Garber 2/23/2024
Passed: Engineering - Final Driveway Smith, Blake 2/23/2024
Passed: Culvert - Access Road/Driveway Right-of-Way Integrity Inspection Gary Pitzer 3/27/2024
Failed: Building - Final 1.in Use Covers Needed On Exterior Outlets Near Ac Unit, 2. Gfci Does Not Function In Hall Bathroom, 3. Smoke Detector Does Not Function In Bedroom To The Left Of Hall Bathroom, 4. Cannot Locate Label For Impact Resistance On Glass At Shower And Window In Shower Area, 5. Need Some Type Of Fire Resistance On Attic Access Ladder, 6. No Gfci Protection In Garage, 6. Label All Breakers In Panel Gary Pitzer 3/27/2024
Passed: Building - Final Gary Pitzer 3/28/2024