- Finished floor requirement
-
- Fema map number
- 12023C0292D
- Type Roofing Job
- Re-Cover - New Material over Existing
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Provide & Install EPS fanfold insulation over existing roofing system. Install new 50 mil PVC Duro-Last roof system
- Type of structure
- Commercial Building
- Commercial or Residential
- Commercial
- Roof Area (for this job) Sq Ft
- 3000
- No. of Stories
- 1
- Roof Pitch
- Less than 2:12
- Is the existing roof being removed?
- No
- Explain if not removing the existing roofing material?
- EPS fanfold insulation over existing roof system
- Type of New Roofing Product
- Flat or Membrane type
- Florida Product Approval Number
- FL16039
- Product Manufacturer
- Duro-Last
- Product Description
- 50 mil PVC Duro-Last
- Building Code Edition
- 2020 Florida Building Code 7th Edition and Florida Statute 553.844
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- Installing EPS fanfold insulation over existing roof system
- Ventilation:
- Off-ridge Vent
- Flashing:
- Use Existing
- Drip Edge:
- Use Existing
- Valley Treatment:
- Use Existing