Permit Details

Permit Search

Permit

Solar Power System

1004 SW FARNELL RD
LAKE CITY, FL 32024

Permit #
000047297
Application #
60523
Status Completed
  1. Submitted Apr 4, 2023
  2. Issued May 22, 2023
  3. Expires Mar 3, 2024
  4. Completed Sep 5, 2023

Property

Parcel #
09600-002
Owner
Mason John R
Acres
21.31
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0505C
PV Type
Stand Alone PV System without Batteries- (DC to AC without utility connection)
Grounding
N.E.C. Chapter 690
AC Options
Exposed
AC Options (Cont..)
In Conduit
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Power Company
Clay Electric
Residential or Commercial?
Residential
Setbacks Front
30'
Setback Side 1
25'
Setbacks Side 2
25'
Setbacks Rear
25'
Where are the panels mounted?
Ground Mounted
Service Amps
1.21

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Documents Required
  10. Final Review - Documents Required
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued

Contractors

  • Ronnie Padgett

    Adt Solar Llc

    License
    EC13001242
    Title
    Cert. Electrical
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jul 31, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Jul 31, 2023

    Failed: Building - Footer

    Hole Depth Don't Match Approved Plans, 4 Holes Have Been Concreted,

    Inspected by Gary Pitzer

  3. Aug 16, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  4. Aug 16, 2023

    Passed: Building - Footer

    Inspected by Gary Pitzer

  5. Aug 16, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Gary Pitzer

  6. Aug 16, 2023

    Cancelled: Building - Footer

    Inspected by Gary Pitzer

  7. Aug 23, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  8. Aug 23, 2023

    Release to power company

    Inspected by Gary Pitzer

  9. Sep 5, 2023

    Passed: Solar - Solar Final

    All Completed

    Inspected by Gary Pitzer

  10. Sep 5, 2023

    Release to power company

    Inspected by Gary Pitzer

  11. Sep 5, 2023

    Passed: Solar - Solar Final

    All Finished At Last Inspection

    Inspected by Gary Pitzer

  12. Sep 5, 2023

    Release to power company

    Inspected by Gary Pitzer