Solar Power System
Permit
| Application #: | 60523 |
| Permit #: |
000047297 |
| Related Permit: |
|
| Submitted: | Tuesday, April 4, 2023 |
| Issued: | Monday, May 22, 2023 |
| Expires: | Tuesday, September 5, 2023 |
| Completed: | Tuesday, September 5, 2023 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0505C |
| PV Type |
Stand Alone PV System without Batteries- (DC to AC without utility connection) |
| Grounding |
N.E.C. Chapter 690 |
| AC Options |
Exposed |
| AC Options (Cont..) |
In Conduit |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Power Company |
Clay Electric |
| Residential or Commercial? |
Residential |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Side 2 |
25' |
| Setbacks Rear |
25' |
| Where are the panels mounted? |
Ground Mounted |
| Service Amps |
1.21 |
Review Notes
| 3/20/2023 |
Application pending. |
| 4/4/2023 |
Application submitted by applicant. |
| 4/13/2023 |
Point Review - Printed-Online Application |
| 4/13/2023 |
Point Review - Reviewed |
| 4/14/2023 |
Plan Review - Reviewed |
| 4/14/2023 |
Zoning Review - Reviewed |
| 4/14/2023 |
Final Review - Documents Required |
| 4/19/2023 |
Final Review - Documents Required |
| 5/11/2023 |
Final Review - Documents Required |
| 5/15/2023 |
Final Review - Documents Required |
| 5/18/2023 |
Final Review - Reviewed |
| 5/18/2023 |
Final Review - Payment Needed |
| 5/22/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ronnie Padgett Adt Solar Llc
County License & State License Expired. |
EC13001242 |
Cert. Electrical |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
7/31/2023 |
| Failed: Building - Footer |
Hole Depth Don't Match Approved Plans, 4 Holes Have Been Concreted, |
Gary Pitzer |
7/31/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
8/16/2023 |
| Passed: Building - Footer |
|
Gary Pitzer |
8/16/2023 |
| Cancelled: Engineering - Setbacks |
|
Gary Pitzer |
8/16/2023 |
| Cancelled: Building - Footer |
|
Gary Pitzer |
8/16/2023 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
8/23/2023 |
| Release to power company |
|
Gary Pitzer |
8/23/2023 |
| Passed: Solar - Solar Final |
All Completed |
Gary Pitzer |
9/5/2023 |
| Release to power company |
|
Gary Pitzer |
9/5/2023 |
| Passed: Solar - Solar Final |
All Finished At Last Inspection |
Gary Pitzer |
9/5/2023 |
| Release to power company |
|
Gary Pitzer |
9/5/2023 |