Permit Details

Permit Search

Permit

New Residential Construction

1276 SW SANTA FE DR
FORT WHITE, FL 32038

Permit #
000047270
Application #
59387
Status Completed
  1. Submitted Mar 8, 2023
  2. Issued Aug 12, 2026
  3. Expires Aug 12, 2027
  4. Completed Sep 21, 2026

Property

Parcel #
00640-000
Owner
The Mershon Living Trust
Acres
1.46
Subdivision
Three Rivers Estates Unit 5
Zoning
ESA-2
Flood zone
AE
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
34.5' One foot above FEMA Map Elevation
Requirement needed
By Final Inspection
Document needed is
Elevation Certificate
Document receieved
Yes
Fema map number
12023C0466C
Water source
Sante Fe
In floodway
Y
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2016
Total Area (Sqft)
2922
Building Height
36
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0449
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.

Status & Review History

  1. Point Review - Printed-Online Application
  2. Point Review - Reviewed
  3. Plan Review - Building Approved
  4. Plan Review - Electrical Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Fuel/Gas Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Documents Required
  12. New address issued and ticket completed.
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Documents Required
  17. Final Review - Documents Required
  18. Final Review - Documents Required
  19. Final Review - Documents Required
  20. Final Review - Documents Required
  21. Final Review - Documents Required
  22. Final Review - Documents Required
  23. Final Review - Documents Required
  24. Final Review - Documents Required
  25. Final Review - Documents Required
  26. Final Review - Documents Required
  27. Final Review - Documents Required
  28. Final Review - Processing
  29. Final Review - Reviewed
  30. Final Review - Payment Needed
  31. Permit Issued
  32. Plan Review - Reviewed
  33. Permit Status Update Notification
  34. Permit Renewed
  35. Permit Reissued

Contractors

This is an owner-builder project.

Inspections

  1. May 24, 2023

    Failed: Electrical - Temporary Service

    No Temporary Service Built

    Inspected by Matt Forsyth

  2. Sep 6, 2023

    Failed: Building - Footer

    Rebar Not Placed In Footer

    Inspected by Matt Forsyth

  3. Sep 6, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Sep 8, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  5. Sep 8, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Nov 13, 2023

    Passed: Building - Footer

    Next Inspection Masonry Column's

    Inspected by Matt Forsyth

  7. Nov 13, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  8. Dec 11, 2023

    Rescheduled 12/12/2023:Building - Vertical Cells/Columns

    Inspected by Matt Forsyth

  9. Dec 12, 2023

    Passed: Building - Vertical Cells/Columns

    Topping Out The Column Is Calling For #3 Ties

    Inspected by Matt Forsyth

  10. Feb 5, 2024

    Rescheduled 2/6/2024:Building - Vertical Cells/Columns

    Inspected by Matt Forsyth

  11. Feb 6, 2024

    Passed: Building - Vertical Cells/Columns

    Embeds In Place Top Of Column

    Inspected by Matt Forsyth

  12. May 22, 2024

    Failed: Building - Ext Strapping/Wall Sheathing

    Structural Brackets Are Missing For Joyce Hangers Wallsheeting Ok

    Inspected by Matt Forsyth

  13. Sep 4, 2024

    Rescheduled 9/6/2024:Building - Ext Strapping/Wall Sheathing

    Inspected by Emaleigh Williams

  14. Sep 6, 2024

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  15. Sep 6, 2024

    Passed: Building - Ext Strapping/Wall Sheathing

    This Is Just Exterior Strapping On The Envelope All Other Fasteners Underneath Will Be Inspected During The Framing Inspection

    Inspected by Matt Forsyth

  16. May 7, 2025

    Passed: Building - Spot Check

    Not Ready For Framing And Rough In Inspections Yet Per Matt

    Inspected by Troy Crews

  17. May 8, 2025

    Passed: Electrical - 1st Underground Rough–In

    Working With Homeowner For Second Rough Inspections

    Inspected by Matt Forsyth

  18. May 9, 2025

    Cancelled: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  19. May 9, 2025

    Passed: Electrical - 2nd Rough-In

    All Switches And Receptacles Are Already Made-up

    Inspected by Matt Forsyth

  20. May 9, 2025

    Passed: Mechanical - Rough In

    Ductwork Finished Above Ceiling Air Handler Not Set

    Inspected by Matt Forsyth

  21. May 9, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  22. May 9, 2025

    Cancelled: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  23. May 30, 2025

    Septic Release Inspection

    Inspected by Health Dept

  24. Jun 2, 2025

    Passed: Electrical - Permanent Power

    Need Temporary Handrail 2 Meter Can Also Need Elevation Certificates To Release Power Picture Of Temporary Railing Will Suffice To Release Power

    Inspected by Matt Forsyth

  25. Jun 16, 2025

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  26. Jun 16, 2025

    Release to power company

    Inspected by Matt Forsyth

  27. Nov 24, 2025

    Release to power company

    Inspected by Mgarber

  28. Nov 24, 2025

    Passed: Electrical - Permanent Power

    Safety Railing Completed For Final Inspection With A Blower Door Test And Termite

    Inspected by Matt Forsyth

  29. Nov 24, 2025

    Release to power company

    Inspected by Matt Forsyth

  30. Sep 9, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    Final Ec And Photo Of Ac Unit Installed. Ok For Co

    Inspected by Karen Aiken-smoot

  31. Sep 9, 2026

    Passed: Building - Final

    Inspected by Matt Forsyth

  32. Requested

    Building - Strapping

    Awaiting inspection