Mobile Home
Permit
| Application #: | 60514 |
| Permit #: |
000047257 |
| Related Permit: |
|
| Submitted: | Sunday, March 19, 2023 |
| Issued: | Wednesday, May 17, 2023 |
| Expires: | Thursday, May 25, 2023 |
| Completed: | Thursday, May 25, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
MFE - 1' ABOVE THE ROAD
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0480C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2019 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
48 |
| Driveway access to home: |
Private Drive |
| Installation Decal # |
93852 |
| Septic # |
23-0073 |
| Setbacks Front |
30 |
| Setback Side 1 |
25 |
| Setbacks Rear |
25 |
| Dev Permit # |
F023- |
| Setback Side 2 |
25 |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA11819670A & LOHGA118189670B |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 3/19/2023 |
Application pending. |
| 3/19/2023 |
Application submitted by applicant. |
| 3/20/2023 |
Point Review - Printed-Online Application |
| 3/20/2023 |
Point Review - Reviewed |
| 3/21/2023 |
Plan Review - Reviewed |
| 3/21/2023 |
Plan Review - Reviewed |
| 3/23/2023 |
Zoning Review - Documents Required |
| 3/23/2023 |
Zoning Review - Corrections Needed |
| 3/24/2023 |
Zoning Review - Corrections Needed |
| 3/29/2023 |
Zoning Review - Documents Required |
| 3/29/2023 |
Zoning Review - Reviewed |
| 4/3/2023 |
Final Review - Reviewed |
| 4/3/2023 |
Final Review - Documents Required |
| 4/10/2023 |
Final Review - Documents Required |
| 4/12/2023 |
Final Review - Contact the Building Dept |
| 5/11/2023 |
Final Review - Reviewed |
| 5/11/2023 |
Final Review - Payment Needed |
| 5/17/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Brent M Strickland
|
IH1104218 |
Mh Installer (ih) |
Contractor |
Trever J Townsend Townsend Electrical Contractors, Llc
|
ER13016105 |
Reg. Electrical |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Anthony Aslan |
4/28/2023 |
| Cancelled: Mobile Home - Mobile Home Set-Up Final |
|
Melissa Garber |
5/22/2023 |
| Cancelled: Engineering - Setbacks |
|
Melissa Garber |
5/22/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
5/22/2023 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Water Washing Under Corner Of Home, Need Berm To Divert Water
need Septic Release |
Anthony Aslan |
5/23/2023 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
5/24/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Wash Out Repaired
need Septic Release |
Anthony Aslan |
5/24/2023 |
| Release to power company |
|
Melissa Garber |
5/25/2023 |
| Certificate-Release Certificate |
|
Melissa Garber |
5/25/2023 |
| Septic Release Inspection |
|
Health Dept |
5/25/2023 |