Permit Details

Permit Search

Permit

Mobile Home

2725 SW BIRLEY AVE
LAKE CITY, FL 32024

Permit #
000047228
Application #
60879
Status Completed
  1. Submitted Apr 20, 2023
  2. Issued May 15, 2023
  3. Expires Jan 31, 2024
  4. Completed Aug 4, 2023

Property

Parcel #
02812-014
Owner
Fennell John Dalton,
Acres
1.00
Subdivision
—
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0290D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2000
Width (Ft.In)
24
Length (Ft.In)
46
Driveway access to home:
Culvert Permit
Installation Decal #
43906
Septic #
23-0249
Setbacks Front
25
Setback Side 1
10
Setbacks Rear
15
Dev Permit #
F023-
Setback Side 2
10
Are you applying for a 5 year temporary permit?
No
Serial #
gagmtd07015a
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Corrections Needed
  4. Plan Review - Reviewed
  5. Zoning Review - Documents Required
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Corrections Needed
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. May 5, 2023

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Floors Need Repair

    Inspected by Matt Forsyth

  2. Aug 2, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Final Grading Septic Release Landing On Front Door With Steps

    Inspected by Matt Forsyth

  3. Aug 2, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Aug 4, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic

    Inspected by Matt Forsyth

  5. Aug 4, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Aug 7, 2023

    Release to power company

    Inspected by Melissa Garber

  7. Aug 7, 2023

    Septic Release Inspection

    Inspected by Health Dept