Permit Details

Permit Search

Permit

New Residential Construction

1494 SW SANTA FE DR
FORT WHITE, FL 32038

Permit #
000047218
Application #
56158
Status Completed
  1. Submitted Aug 29, 2022
  2. Issued May 11, 2023
  3. Expires Dec 7, 2024
  4. Completed Jun 10, 2024

Property

Parcel #
00641-011
Owner
Futral James H, Futral Cathy C
Acres
0.62
Subdivision
Three Rivers Estates Unit 6
Zoning
ESA-2
Flood zone
AE
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
34' One foot above FEMA Map Elevation
Requirement needed
By Permanent Power Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0466C
In floodway
Y
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
1305
Total Area (Sqft)
1557
Building Height
14
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0865
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - On Hold-Incomplete
  6. Point Review - On Hold-Incomplete
  7. Point Review - Email Sent
  8. Point Review - On Hold-Incomplete
  9. Point Review - On Hold-Incomplete
  10. Point Review - Printed-Online Application
  11. Point Review - Reviewed
  12. Plan Review - Documents Required
  13. Plan Review - Building Approved
  14. Plan Review - Electrical Approved
  15. Plan Review - Mechanical Approved
  16. Plan Review - Plumbing Approved
  17. Plan Review - Fuel/Gas Approved
  18. Plan Review - Reviewed
  19. Zoning Review - Reviewed
  20. Final Review - Documents Required
  21. Final Review - Documents Required
  22. Final Review - Documents Required
  23. Final Review - Documents Required
  24. Final Review - Documents Required
  25. Final Review - Documents Required
  26. Final Review - Documents Required
  27. Final Review - Documents Required
  28. Final Review - Documents Required
  29. Final Review - Documents Required
  30. Final Review - Documents Required
  31. Final Review - Documents Required
  32. Final Review - Documents Required
  33. Final Review - Documents Required
  34. Final Review - Documents Required
  35. Final Review - Reviewed
  36. Final Review - Reviewed
  37. Final Review - Payment Needed
  38. Final Review - Payment Needed
  39. Permit Issued
  40. Final Review - Payment Needed

Contractors

  • Dustin Busscher

    Busscher Enterprises Llc Dba Jbc Builders

    License
    CBC1263910
    Title
    Cert. Building
    Role
    Contractor
  • Robert Jarvis

    Jarvis Heat And Air Llc

    License
    CAC1816766
    Title
    Class "b" A/c
    Role
    Subcontractor

    County License & State License Expired.

  • Curtis Graddy

    Curtis Graddy Plumbing Llc

    License
    CFC043064
    Title
    Plumbing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

  • Lewis G Walker

    Lewis Walker Roofing Inc

    License
    CCC1333551
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Alaina Perry

    North Florida Maintenance And Repair Services Llc

    License
    ER13016315
    Title
    Reg. Electrical
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jun 27, 2023

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  2. Jun 27, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jul 31, 2023

    Passed: Building - Vertical Cells/Columns

    Inspected by Matt Forsyth

  4. Nov 21, 2023

    Cancelled: Building - Wall Sheathing

    Inspected by Anthony Aslan

  5. Nov 21, 2023

    Failed: Building - Roof Decking

    Spray Foam Insulation No Way To Verify Need Engineer Letter

    Inspected by Anthony Aslan

  6. Nov 21, 2023

    Failed: Building - Ext Strapping/Wall Sheathing

    Nails Missing Sheating Loose In Multiple Places Needs To Be Corrected

    Inspected by Anthony Aslan

  7. Nov 21, 2023

    Failed: Building - Framing

    No Safety Railling On Rear Stairs & Porch Needs To Be Corrected Immediately spray Foam Need Engineer Letter

    Inspected by Anthony Aslan

  8. Nov 21, 2023

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Anthony Aslan

  9. Nov 21, 2023

    Failed: Building - Insulation

    No Safety Railling On Rear Stairs & Porch Needs To Be Corrected Immediately

    Inspected by Anthony Aslan

  10. Nov 21, 2023

    Cancelled: Building - Strapping

    Inspected by Anthony Aslan

  11. Nov 21, 2023

    Failed: Mechanical - Rough In

    No Safety Railling On Rear Stairs & Porch Needs To Be Corrected Immediately ducts Missing Proper Strapping exhaust Fans Not Installed fresh Air Missing Proper Damper And Needs To Be Installed At Unit For Access To Damper, Fresh Air Requires A Filter

    Inspected by Anthony Aslan

  12. Nov 21, 2023

    Failed: Electrical - 2nd Rough-In

    No Safety Railling On Rear Stairs & Porch Needs To Be Corrected Immediately

    Inspected by Anthony Aslan

  13. Nov 21, 2023

    Failed: Plumbing/Gas - 2nd Rough-In

    No Safety Railling On Rear Stairs & Porch Needs To Be Corrected Immediately

    Inspected by Anthony Aslan

  14. Nov 30, 2023

    Failed: Building - Ext Strapping/Wall Sheathing

    Strapping Is Being Redone

    Inspected by Matt Forsyth

  15. Nov 30, 2023

    Failed: Building - Insulation

    Second Roughs Have To All Be Complete Before Passing An Insulation Inspection Including Framing

    Inspected by Matt Forsyth

  16. Nov 30, 2023

    Failed: Building - Framing

    Not Complete

    Inspected by Matt Forsyth

  17. Nov 30, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  18. Nov 30, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  19. Nov 30, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  20. Nov 30, 2023

    Failed: Plumbing/Gas - 2nd Rough-In

    Need Water Test For Upper Floor Dwv

    Inspected by Matt Forsyth

  21. Dec 6, 2023

    Passed: Building - Ext Strapping/Wall Sheathing

    Extra Strapping Installed

    Inspected by Matt Forsyth

  22. Dec 6, 2023

    Passed: Building - Framing

    H2.5 Truss Tail Strapping

    Inspected by Matt Forsyth

  23. Dec 6, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Upper Floor Dwv Water Tested Will Need Shower Liner Inspection When Ready

    Inspected by Matt Forsyth

  24. Dec 6, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  25. Mar 27, 2024

    Passed: Electrical - Permanent Power

    Need Septic Release To Release Power

    Inspected by Matt Forsyth

  26. Apr 2, 2024

    Septic Release Inspection

    Pending Corrected Elevation Certificate -- Do Not Release Power Until Rec'd--rec'd

    Inspected by Health Dept

  27. Apr 9, 2024

    Release to power company

    Inspected by Melissa Garber

  28. May 30, 2024

    Failed: Building - Final

    Not Ready For Final

    Inspected by Matt Forsyth

  29. Jun 6, 2024

    Passed: Building - Final

    Co Pending Install Of Two Smoke Detectors One In Hall, One In Primary Bedroom. Existing House To Become Storage Or Pavillion No Living Quarters Power Coming From Main Dwelling.

    Inspected by Troy Crews

  30. Jun 10, 2024

    Passed: Building - Final

    Pictures Of Smoke Detectors Installed Sent.

    Inspected by Troy Crews

Documents