Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
4/27/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/21/2023 |
Passed: Building - Footer |
Dig Out Back Footer Where Cave In |
Anthony Aslan |
7/3/2023 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
7/3/2023 |
Cancelled: Building - Strapping |
|
Anthony Aslan |
8/3/2023 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
8/3/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
8/3/2023 |
Passed: Building - Framing |
No Windows Or Doors Installed |
Anthony Aslan |
8/3/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
8/24/2023 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
9/21/2023 |
Failed: Building - Insulation |
Gaps In Insulation, No Foam Around Windows |
Anthony Aslan |
10/27/2023 |
Failed: Mechanical - Rough In |
No Gaskets On Supply And Return Drops |
Anthony Aslan |
10/27/2023 |
Passed: Building - Insulation |
|
Anthony Aslan |
11/1/2023 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
11/1/2023 |
Passed: Building - Framing |
Window &.door |
Anthony Aslan |
11/7/2023 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
No Water In Shower Pan |
Anthony Aslan |
1/8/2024 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Rec'vd Photos |
Anthony Aslan |
1/12/2024 |
Failed: Building - Final |
Forgot To Schedule |
Anthony Aslan |
3/7/2024 |
Passed: Engineering - Spot Check |
Wires And Outlets Need To Be Safety Off |
Anthony Aslan |
7/10/2024 |
Certificate-Release Certificate |
|
Anthony Aslan |
9/16/2024 |
Passed: Building - Final |
Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Anthony Aslan |
9/16/2024 |