Permit Details

Permit Search

Permit

New Residential Construction

262 SW OAK WAY
LAKE CITY, FL 32025

Permit #
000046869
Application #
59175
Status Completed
  1. Submitted Feb 28, 2023
  2. Issued Mar 30, 2023
  3. Expires May 28, 2024
  4. Completed Nov 30, 2023

Property

Parcel #
09116-128
Owner
Foxx Ronnie, Foxx Jocelyn
Acres
5.01
Subdivision
Hills At Rose Creek Phase 1
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0384D
In floodway
Y
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2550
Total Area (Sqft)
4022
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0030
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Fuel/Gas Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Apr 5, 2023

    Passed: Building - Footer

    Foyer Steer Bonded, Long Tail

    Inspected by Gary Pitzer

  2. Apr 5, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Apr 6, 2023

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  4. Apr 6, 2023

    Release to power company

    Inspected by Gary Pitzer

  5. Apr 27, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Drains And Vents Only, No Water Or Gas

    Inspected by Gary Pitzer

  6. May 9, 2023

    Passed: Building - Slab

    Plastic Down,taped And Steel

    Inspected by Gary Pitzer

  7. Jun 28, 2023

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  8. Jun 28, 2023

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  9. Jul 14, 2023

    Passed: Building - Framing

    Inspected by Gary Pitzer

  10. Aug 1, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  11. Aug 1, 2023

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  12. Aug 1, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  13. Aug 7, 2023

    Passed: Building - Insulation

    Foam Walls And Roof, Draft Stopping In Place

    Inspected by Gary Pitzer

  14. Aug 21, 2023

    Passed: Building - Lath/Stucco

    Inspected by Gary Pitzer

  15. Oct 16, 2023

    Failed: Electrical - Permanent Power

    Need Drive Inspection,

    Inspected by Gary Pitzer

  16. Oct 27, 2023

    Septic Release Inspection

    Inspected by Health Dept

  17. Nov 2, 2023

    Passed: Electrical - Permanent Power

    Do Not Release Till Drive Inspection Is Complete

    Inspected by Gary Pitzer

  18. Nov 7, 2023

    Release to power company

    Inspected by Melissa Garber

  19. Nov 30, 2023

    Passed: Building - Final

    House Only

    Inspected by Gary Pitzer

Documents