Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
6/21/2023 |
Release to power company |
|
Anthony Aslan |
6/21/2023 |
Passed: Building - Footer |
|
Anthony Aslan |
6/21/2023 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
6/21/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/27/2023 |
Passed: Building - Slab |
|
Anthony Aslan |
6/30/2023 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
8/1/2023 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
8/1/2023 |
Passed: Building - Framing |
T02 Missing Engineering |
Anthony Aslan |
8/15/2023 |
Failed: Mechanical - Rough In |
Incomplete |
Anthony Aslan |
8/28/2023 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
8/28/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
Tub Over Flow Not Piped In, No Water In Tub |
Anthony Aslan |
8/28/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
8/31/2023 |
Passed: Building - Framing |
|
Anthony Aslan |
9/1/2023 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
9/1/2023 |
Passed: Building - Insulation |
|
Anthony Aslan |
9/7/2023 |
Passed: Electrical - Permanent Power |
Need Septic Release
need Driveway Release |
Anthony Aslan |
10/6/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
10/9/2023 |
Release to power company |
Rec'd Septic And Drive |
Anthony Aslan |
10/12/2023 |
Septic Release Inspection |
|
Health Dept |
10/12/2023 |
Failed: Building - Final |
No Disconnect On Water Heater(corrected)
master Toilet Not Connected (corrected)
outlet To The Left Not Gfci (corrected)
no Blower Door (rec'd) |
Anthony Aslan |
10/30/2023 |
Passed: Building - Final |
|
Anthony Aslan |
11/1/2023 |