Permit Details

Permit Search

Permit

Storage Building

486 SW CENTRAL TER
FORT WHITE, FL 32038

Permit #
000046818
Application #
58981
Status Completed
  1. Submitted Feb 7, 2023
  2. Issued Mar 24, 2023
  3. Expires Nov 15, 2023
  4. Completed May 19, 2023

Property

Parcel #
01050-000
Owner
Schnorr George Iii, Schnorr Cynthia Ann
Acres
0.91
Subdivision
Three Rivers Estates Unit 18
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0459C
Type of Structure
Storage Building
Commercial or Residential?
Residential
Total Area (Sqft)
2400
Septic# (00-0000) or (X00-000)
23-0114
Setbacks Front
30'
Setback Side 1
10'
Setback Side 2
10'
Setback Rear
10' (accessory)
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
storage
Dev Permit #
F023-
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Building Height
14'
Building Length
60'
Building Width
40'
Service Amps
100

Status & Review History

  1. Point Review - Printed-Online Application
  2. Point Review - Reviewed
  3. Plan Review - Documents Required
  4. Plan Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - On Hold-Incomplete
  8. Plan Review - On Hold-Incomplete
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Feb 14, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Apr 26, 2023

    Failed: Building - Footer

    No Pictures Of Footing Summitted To Building Department.

    Inspected by Matt Forsyth

  3. Apr 26, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Apr 27, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Apr 27, 2023

    Passed: Building - Footer

    Inspected by Matt Forsyth

  6. May 19, 2023

    Passed: Electrical - Utility Pole Final

    Inspected by Matt Forsyth

  7. May 19, 2023

    Release to power company

    Inspected by Matt Forsyth